References
- 우종훈, 이광국, 정호림, 권영대, 신종계, 2005, '디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축,' 대한조선학회 논문집, 제42권, 제2호, pp. 165-174
- 이광국, 강현진, 김세환, 박주용, 신종계, 2005, '조선 소조립 용접로봇토치 변경에 따른 디지털 생산 기반 생산성 향상방안 평가,' 한국 CAD/CAM 학회 논문집, 제10권, 제3호, pp.210-216.
- 이광국, 최동한, 한상동, 박주용, 신종계, 2006, '디지털 생산 시뮬레이션 기반의 판넬라인 일정계획지원 시스템 구축,' 대한조선학회 논문집, 제43권, 제2호, pp. 228-235 https://doi.org/10.3744/SNAK.2006.43.2.228
- 신종계, 2005, 고부가가치 선박 개발용 디지털 통합 건조공법 개발, 사업 최종보고서, 산업자원부
- Bair, F., Langer, Y., Caprace, J., and Rigo, P., 2005, 'Modeling, Simulation, and Optimization of a Shipbuilding Workshop,' The 4th International Conference on Computer Applications and Information Technology in the Maritime Industries(COMPIT'05), pp. 283-293
- Banks, J., Carson J.S., Nelson, B.L., and Nichol , D.M., 2001, 'Discrete-Event System Simulation 3rd Edition,' Prentice-Hall International Series in Industrial and Systems Engineering, Upper Saddle River, New Jersey 07458
- Chung, C.A., 2004, Simulation Modeling Handbook – A Practical Approach, CRC Press
- Kaarsemaker, J. and Nienhuis, U., 2006, 'Simulation of a Maritime Pre-fabrication Process,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)
- Nedess, C., Friedewald, A., Wagner, L., and Hubler M., 2006, 'Simulation of Material Flow Processes in the Planning of Production Spaces in Shipbuilding,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)
- Krause M., Roland F., Steinhauer D., and Heinemann M., 2004, 'Discrete Event Simulation: An Efficient Tool to Assist Shipyard Investment and Production Planning,' Journal of Ship Production, Vol. 20, No. 3, pp. 176–182
- Steinhauer, D., 2003, 'The Virtual Shipyard – Simulation in Production and Logistics at Flensburger,' 2nd COMPIT, pp. 203-209
- Steinhauer, D., 2005, 'SAPP – Simulation Aided Production Planning at Flensburger,' Proceedings of COMPIT, pp. 391-398
- Steinhauer, D. and Meyer-Konig, S., 2006, 'Simulation Aided Production Planning in Block Assembly,' The 5th International Conference on Computer Applications and Information Technology in the Maritime Industries (COMPIT'06)
Cited by
- Discrete Event Simulation for the Initial Capacity Estimation of Shipyard Based on the Master Production Schedule vol.17, pp.2, 2012, https://doi.org/10.7315/CADCAM.2012.111
- A Study on Simulation based Manufacturing in Shipyards : Focused on a Long-term Plan Verification vol.20, pp.1, 2014, https://doi.org/10.7837/kosomes.2014.20.1.086