연속 합성 박스거더 설계, 해석 및 실험

Design, Analysis and Testing Continuous Composite Box-Gilders

  • 류형근 (서울대학교 지진공학연구센터) ;
  • 장승필 (서울대학교 지구환경시스템)
  • 발행 : 2006.06.01

초록

키워드

참고문헌

  1. AASHTO LRFD Bridge Design Specifications (1998), SI units, 2nd edition
  2. Chang SungPil, Ryu HyungKeun (2004) Development of steel and concrete composite bridges with precast decks in Korea" International Journal of Steel Structure, March, 2004
  3. EUROCODE 3: Design of Steel Structures, DD ENV 1993-1-1, BSI
  4. EUROCODE 4: Design of Composite Steel and Concrete Structures, Part 2. Composite Bridges, DD ENV 1994-2, BSI
  5. J.M.Rotter, P.Ansourian (1979), Cross-section behaviour and ductility in composite beams, Proc.Instn Civ Engrs Part 2, 67, June, pp.453-474
  6. Kim jong-Hee, Shim Chang-Su, Shigeyuki Matsui and Chang Sung-Pil (2002), "The Effect of Bedding Layer on the Strength of Shear Connection in Full Depth Precast Deck", AISC Volume 39, No.3 Third Quarter Engineering Journal
  7. Ryu. HK., Shim. C.S., Chang. S.P. (2004), "Testing a Continuous Composite Box-Girder Bridge with Precast Decks", ICE, Proc. Instn Civ. Engrs, Structures and Buildings, 157, Aug., issue SB4, pp.243-250
  8. Ryu HK, Shim. C.S., Chang. S.P., Chung. C.H (2004), "Inelastic Behaviour of Externally Prestressed Continuous Composite Box-Girder Bridge with Prefabricated Slabs", Journal of Constructional Steel Research, Vol 60/7 pp.989-1005 https://doi.org/10.1016/j.jcsr.2003.09.004
  9. Ryu. H.K., Chang S.P. (2005), Ultimate strength of continuous composite box-girder bridges with precast decks, Journal of Constructional Steel Research, 61, 2005, pp.329-343 https://doi.org/10.1016/j.jcsr.2004.08.003
  10. Ryu. H.K., Chang SP, Kim YJ, Kim BS (2005), Crack control of a steel and concrete composite plate girder with prefabricated slabs under hogging moments, Engineering Structures, Vol 27/11, pp. 1613-1624, 2005 https://doi.org/10.1016/j.engstruct.2005.05.015
  11. Ryu HK., Ultimate strength of Continuous Composite Girders with Semi-compact and Slender section, Ph.D. Thesis, Seoul National University, 2005
  12. Ryu HK, Youn SG, Bae DB, Lee YG, "Bending Capacity of Composite Girders with Class 3 sections", Journal of Constructional Steel Research, 2006
  13. Ryu HK, Chang SP, Kim YJ, Experimental study on Static and Fatigue strength of Loop Joints, Engineering Structures, in press
  14. Shim, Chang-Su, Kim, jong-Hee, Chung, Chul-Hun, and Chang, Sung-Pil (2000), "The Behaviour of Shear Connectionin CompositeBeamwith Full-Depth Precast Slab," Proc. Instn Civ. Engrs, Structures and Buildings, Feb., Vo1.140, pp.101-110
  15. Shim, CS, Chang, SP, Cracking of Continuous Composite Beams with Precast Decks, Journal of Constructional Steel Research, 2003, Vol. 59, pp.201-214 https://doi.org/10.1016/S0143-974X(02)00032-9
  16. 류형근, 윤석구, 배두병, 장승필 (2005), "조밀단면을 갖는 부분합성보의 극한강도 평가", 대한토목학회 논문집, Vol.5-A
  17. 류형근, 김영진, 장승칠 (2005), "2거더 연속합성형교 루프 이음 프리캐스트 바닥판의 정적 및 피로거동", 대한토목학회 논문집, Vol.5-A
  18. 류형근, 장승필 (2003), "증가프리스트레스력을 고려한 외부프리스트레스트 강합성교량의 장기거동해석에 관한 연구", 대한토목학회 논문집, 1, 2003
  19. 류형근, 장승필 (2003), "부분합성을 고려한 외부 프리스트레스트 합성보의 증가 프리스트레스 산정", 대한토목학회 학술발표회, 2003
  20. 배두병, 윤석구, 함상희 (2004) "콘크리트 건조수축에 의한 합성거더의 장기거동", 한국강구조학회 논문집, 제16권, 6호, 12월, pp.807-817
  21. 정승인, 류형근, 장승필 (2003), "외부 프리스트레스트 강합성보의 탄소성 휨거동 해석", 한국강구조학회 논문집, 2003.2