Cost Estimation for the Marine Engine's Factory using Association Rule

데이터마이닝을 이용한 선박용 엔진 공장의 견적지원 방안

  • 오경모 (제론정보기술(주)) ;
  • 박창권 (울산대학교 산업정보경영공학부)
  • Received : 20060300
  • Accepted : 20061000
  • Published : 2006.12.31

Abstract

The purpose of this thesis is to develop the schemes of supporting estimate for marine engines’ factories which are in a general make-to-order style. The marine engines’ factories currently use the method which depends on the past data and experiences handled by the responsible person, which causes inefficiency and inaccuracy in dealing with a huge amount of data. We apply association rule to solving the problems mentioned above. Critical data for analysis is filtered among materials that have been using actual records of performance so far. Secondly, relation with each part of marine engines through filtered data so that the company can estimate cost promptly and precisely if customers with similar components as requested. By proposed method of study estimate support efficient and supported exactly.

Keywords

References

  1. Ahn, K. I. and Kim, S. J. (2003), A New Interestingness Measure in Association Rules Mining, Journal of the Korean Institute of Industrial Engineers, 29(1), 41-48
  2. Back, D. H. and Nam, J. K(2002), The Semiconductor Yield Improve System using Data Mining, 2002 IE & MS Spring Conference Papers, 293-300
  3. Berry, J. and Linoff, G.(1997), Data Mining Technique: For Marketing, Sales, and Customer Support, John Wiley & Sons
  4. Chun, S. H. and Ock, Y. S.(2003), Development of DBR Scheduling System in Make-to-Order manufacturing environment, 2003 IE & MS Spring Conference Papers, 445-449
  5. Henry, L. C. and Kingsman, B. G.(1989), Production planning systems and their applicability to make-to-order companies, European Journal of Operations Research, 40(1), 1-15 https://doi.org/10.1016/0377-2217(89)90266-X
  6. Je, M. K and Ock, Y. S.(2003), Development of scheduling system under Make-to-Order Environments: Ship equipment and marine machinery company, 2003 IE & MS Spring Conference Papers, 430-434
  7. Jeong, J. W., Kang, B. Y., and Kim, S. Y(2001), A Study on the Development of Evaluation System for the Second-handed Middle & Small Ship, Bulletin of the Society Naval Anhiteasof Korea, 55-58
  8. Jhee, W. C. and Suh, M. S.(1998), DSS Architectures to Support Data Mining Activities for Supply Chain Management, Journal of MIS Research, 8(3), 51-73
  9. Kim, J. R. and Lee, Y. L.(2002), Development of an Automated Construction Cost Estimating System for Computer Integrated Construction(CIS) System, Journal of Civil Engineering, 159-169
  10. Kim, K. H, Shin, K. T., and Park, J. W.(2003), Cost-Estimation Support System for Injection Mold Using QFD(Qualiry Function Deployment) and AI Methods, 2003 IE & MS Spring Conference Papers, 948-957
  11. Koh, J. M., Seo, J. Y.(2002), A study of contents management in the B2B of Make-to-order, Information System Research, 11(1), 129-149
  12. Lee, Y. H., Kim, S. S., and Bae, H. J.(1996), Case of Study Automatic Warehouse Optimized Design and Automatic Estimation Support System, Industrial Engineering Magazine, 3(1), 31-37
  13. Oh, K. M. and Park, C. K.(2005), Process Planning Method under Make-to Order Production System using Data Mining, IE Interfaces, 18(2), 148-157
  14. Park, C. G. and Song, J. S.(1998), Delivery Date Decision Support System for the Large Scale Make-to-Order Manufacturing Companies: An Electric Motor Company Case, IE Interfaces, 11(3), 181-191
  15. Yeh, C. H.(2000), A customer-focused planning approach to make-to-order production, Industrial Management & Data System, 100(4), 80-187