The structural behavior of concrete girder in bridges constructed by free cantilever method is time-dependent due to creep and shrinkage of concrete. The constraint effects of longitudinal movement of concrete girders can introduce unfavourable moment into piers. This study is aimed at proposing a method to reduce the moment of piers in bridge constructed by free cantilever method. The method are systematically composed of time-dependent structural analysis of bridges and loading of control force during construction of bridge. Numerical analyses are carried out depending on the parameters such as amount of control force and flexibility of pier. Time-dependent structural behavior shows that moment of pier increases according as pier height decreases. Also, moment of pier decreases when control method are applied. Numerical result of the study represents that time-dependent moment of piers can be controlled effectively by employing the proposed method.

FCM 교량 상부구조의 거동은 콘크리트의 크리프와 건조수축 등에 의해 시간 의존적 거동을 나타내며, 이에 의해 하부구조 즉, 교각에는 시간에 따른 추가의 과도한 모멘트가 발생할 수 있다. 본 연구에서는 FCM 공법으로 시공되는 콘크리트 교량의 크리프와 건조수축에 의한 교각의 모멘트를 감소시킬 수 있는 기법을 제안하였다. 제안 기법은 교량의 체계적인 시간의존적 거동 해석과 교량 시공중의 제어하중 재하로 이루어진다. 제어하중의 크기 및 교각 유연도에 따른 교각의 거동 분석을 수행하였다. 교각 유연도에 따른 수치해석 결과는 교각의 유연도가 작을수록 시간에 따른 교각 모멘트 값은 증가하여 설계시 불리한 측면을 나타내고 있다. 제어하중을 도입하지 않은 경우에 비해 제어하중을 도입한 경우의 모멘트는 감소하고 있다. 또한, 실제 교량에 대한 수치해석 분석을 통하여 제안기법의 효용성을 제시하였다. 따라서, FCM 공법으로 시공되는 교량에서, 유연도가 작은 교각의 시간에 따른 모멘트 변화를 효율적으로 제어할 수 있다고 판단된다.

Keywords

References

  1. Reid, S. G. and Coker, D., 'Modelling of Non-Linear Time-Dependent Effects of Creep and Shrinkage in Prestressed Concrete Bridges', Proceedings of the 1st fib Congress, Osaka, 2002
  2. Ketchum, M. A., Redistribution of Stresses in Segmentally Erected Prestressed Concrete Bridges, UCB/SESM Report No. 86-07, University of California at Berkeley, 1986
  3. Kang, Y. J., SPCFRAME-Computer Program for Nonlinear Segmental Analysis of Planar Concrete Frames, UCB/SESM Report No. 89/07, University of California at Berkeley, 1989
  4. Cruz, P. J. S., Mari, A. R., and Roca, P., 'Nonlinear TimeDependent Analysis of Segmentally Constructed Structures', Journal of Structural Engineering, ASCE, Vol. 124, No.3, 1998, pp.278-287 https://doi.org/10.1061/(ASCE)0733-9445(1998)124:3(278)
  5. Bishara, A. G. and Papakonstantinou, N. G., 'Analysis of Cast-In-Place Concrete Segmental Cantilever Bridges', Journal of Structural Engineering, ASCE, Vol.116, 1990, No.5, pp.1247-1269 https://doi.org/10.1061/(ASCE)0733-9445(1990)116:5(1247)
  6. Mathivat, J., The Cantilver Construction of Prestressed Concrete Bridges, John Wiley and Sons, New York, 1983
  7. Desai, N. D. and Desai, J. N., 'Segmental Construction Bridges & the Effects of Creep-The State of Art', Proceedings of fib Symposium 2004-Segmental Construction in Concrete, New Delhi, 2004
  8. Chiorino, M. A. and Lacidogna, G., 'Creep Effects in Cantilever Built Bridges after Final Connections', Proceedings of fib Symposium 2004-Segmental Construction in Concrete, New Delhi, 2004
  9. Takacs, P. F., 'Deformation Problem of Record Span Concrete Cantilever Bridges', Proceedings of IABSE Symposium, Melbourne, 2002
  10. 곽효경, 손제국, 'FCM 공법으로 시공되는 교량의 경간비 결정', 대한토목학회논문집, Vol.23, No.2A, 2003, pp.325-334
  11. Magma, D. D., Sozen, M. A., and Siess, C. P., 'A Study of Stress Relaxation in Prestressing Reinforcement', PCI Journal, Vol.9, No.2, 1964, pp.13-57 https://doi.org/10.15554/pcij.04011964.13.57
  12. Hernandez, H. D. and Gamble, E. L., Time Dependent Prestress Losses in Pretensioned Concrete Construction, Structural Research Series No. 417, Civil Engineering Studies, University of Illinois at Urbana, 1975
  13. 양인환, '프리스트레스트 콘크리트 박스 거더의 종방향 프리스트레싱에 의한 슬래브의 횡방향 응력', 콘크리트학회논문집, Vol.15, No.3, 2003, pp.679-688 https://doi.org/10.4334/JKCI.2003.15.5.679