Stress Monitoring System for Buried Gas Pipeline in Poor Ground

연약지반 배관응력 모니터링 시스템 개발 및 적용

  • 홍성경 (한국가스공사 연구개발원) ;
  • 김준호 (한국가스공사 연구개발원) ;
  • 정석영 (한국가스공사 연구개발원)
  • Published : 2006.02.28

Abstract

This paper introduces stress monitoring system for buried gas pipeline in poor ground. During the six months of improvement construction of poor ground, maximum settlement of gas pipeline is about 40 cm. This value represents relative small compared to the initial settlement estimation of ground improvement construction plan, 90 cm. Also, this paper includes the result of finite element analysis of gas pipeline to confirm safety of pipelines in poor ground. The stress monitoring system for gas pipeline was developed to guarantee the safety of buried gas pipeline in poor ground. Eventually, the ground improvement workings are ended safely and it is proved that the pipeline has no safety problem.

Keywords

References

  1. 한국강구조학회, '강구조공학', 구미서관, 2000
  2. National Cooperative Highway Research Program, 'Fatigue Evaluation Procedures for Steel Bridges', 1987
  3. 홍성경, 김준호, 정석영, '연약지반 배관응력 모니터링 시스템 개발 및 적용', 한국안전학회 춘계학술발표회, pp. 21-26, 2005
  4. 과학기술편집부, '지중매설관의 조사 : 설계에서 시공까지', pp. 257-316, 1998
  5. National Instrument, LabVIEW 7 Express, 2003