DOI QR코드

DOI QR Code

Estimation of the Reactor Volume Ratio for Nitrogen Removal in Step-Feed Activated Sludge Process

단계 주입 활성슬러지공법에서 질소제거를 위한 반응기 용적비 추정

  • Published : 2006.06.30

Abstract

Theoretical total nitrogen removal efficiency and reactor volume ratio in oxic-anoxic-oxic system can be found by influent water quality in this study. The influent water quality items for calculation were ammonia, nitrite, nitrate, alkalinity, and COD which can affect nitrification and denitrification reaction. Total nitrogen removal efficiency depends on influent allocation ratio. The total nitrogen removal follows the equation of 1/(1+b). Optimal reactor volume ratio for maximum TN removal efficiency was expressed by those influent water quality and nitrification/denitrification rate constants. It was possible to expect optimal reactor volume ratio by the calculation with the standard deviation of ${\pm}14.2$.

Keywords

References

  1. H. J. Gijzen, The Nitrogen Cycle Out of Balance, Water21, August, Washington, USA (200l)
  2. 水谷潤太郞, 總窒素.總りンの物質循環図, 日本土木學會論文集, 566, p. 103-108 (1997)
  3. U.S. EPA, Manual-Nitrogen control, U.S. EPA, Washington (1993)
  4. Metcalf & Eddy, Wastewater Engineering, 3rd ed., Mcgraw-Hill, New York (1991)
  5. B. Sharma and R. Ahilert, Nitrification and Nitrogen Removal, Wat. res., 11(8), pp. 897-925 (1977) https://doi.org/10.1016/0043-1354(77)90078-1
  6. S. Fujii and F. Boonyarat, The 2nd Ku-Kaist-Ntu Tri-lateral Seminar/Workshop on Environmental & Sanitary Engineering, Seoul, Kaist, pp. 219-222 (1993)
  7. S. Fujii and I. Somiya, Simulation of Nitrogen Balance in Large-scale Domestic Sewage Treatment Plant Including the Sludge Treatment Process, Proceeding of third Kyoto-Kaist Joint Seminar/Workshop on Civil Engineering, Seoul, Kaist, pp. 803-806 (1990)
  8. W. Oldham, R. Abraham, R. Dawson, and G. McGeachite, Design of BNR Plants for Temperature Climates and Dilute Wastewater- European and Canadian Experience Incorporating Primary Sludge Fermentation, In: Nutrient Removal from Wastewater, Horan, N. ed. Technomic, Lancaster, pp. 209-214 (1994)
  9. B. Bachelor, Kinetic Analysis of Alternative Configuration for Single-sludge Nitrification/denitrification, Wat. Poll. Cont. Fed., 54, pp. 1492-1504 (1982)
  10. G. Gilles and C. David, Dynamic Modeling and Expert Systems in Wastewater Engineering, Lewis Publications, New York (1989)
  11. A. Haandel, G. Ekama, and R. Marais, The Activated Sludge Process-III. Single Sludge Denitrification, Wat. Res., 15, pp. 1135-1152 (1981) https://doi.org/10.1016/0043-1354(81)90089-0
  12. I. Hiroshi, H. Esumi, J. Ishihara, and H. Wakuri, Some Problems of Denitrification-dephosphorus Operation in Full-scale Plant, 27th Annual Conference of Japan Sewage Work Association, pp. 529-531 (1990)
  13. H. Tatsuro, N. Shigeru, and W. Hideya, Promotion of Nitrogen Removal by Change of Operational Conditions in the Dual Recycling Method, 28th Annual Conference of Japan Sewage Work Association, pp. 499-501 (199l)
  14. Y. Sakai, H. Hikami, and Y. Kawata, Step-feed and Anoxic Oxic Activated Sludge Process, 27th Annual Conference of Japan Sewage Work Association, pp. 381-383 (1990)
  15. M. Toshihide, T. Tetsuo, and M. Tenichi, Nitrification-denitrification Operation in a Full Scale Plant, 27th Annual Conference of Japan Sewage Work Association, pp. 505-507 (1991)
  16. R. Wilson, K. Murphy, P. Sutton, and S. Lackey, Design and Cost Comparison of Biological Nitrogen Removal Processes, Wat. Poll. Cont. Fed., 53, pp. 1294-1302 (1981)