Abstract
Although a number of static pile load tests have been performed in this country, re-consideration on the interpretation and loading method is needed, because of their less usefulness in practice. For this study, a static loading testing was performed for a long instrumented PHC pile, which was installed in sand layer overlying thick soft clay. The shaft resistance of the pile had been monitored for a long time after installation, and then the static load testing was performed by the quick load test, unlike the recent Korean practice. Using the measured data, the elastic modulus of pile, residual stress and true resistance on the pile were determined. In the event, it was found that the residual stress on the pile, which remained prior to the static loading, significantly affects the shaft and toe resistances. Also, it was realized that the setup effect for the long pile is significant.
국내에서 말뚝 정재하 실험이 수많이 수행되고 있지만, 그 결과의 활용도가 낮아서 재하실험 방법과 분석방법 등에 대하여 재고할 필요성이 제기되고 있다. 본 연구에서는 두터운 연약지반 하부의 모래층에 PHC 말뚝 선단을 지지시킨 후 하중전이 정재하 실험을 수행하였다. 말뚝의 설치 이후에 장기간에 걸쳐 주면 마찰력을 측정하였으며, 국내에서 보편적으로 적용되고 있는 재하법과는 다른 급속재하법에 의하여 정재하실험을 실시하였다 그 실험결과를 이용하여 말뚝의 탄성계수, 잔류응력 및 참 지지력을 산정하였다. 결과적으로, 재하실험 전에 말뚝에 존재하는 잔류하중이 주면 마찰력과 선단지지력에 크게 영향을 미친다는 사실을 확인할 수 있었다. 또한, 점성토 지반에서의 장대말뚝에 대해서는 지반의 강도회복(setup) 효과가 매우 크다는 사실을 알 수 있었다.