DOI QR코드

DOI QR Code

Step-Feed 공정에서의 생물학적 질소제거 Modeling

Modeling for Biological Nitrogen Removal in Step-Feed Process

  • 발행 : 2005.03.31

초록

Step-feed process for biological nitrogen removal were analyzed numerically for the each unit and final total nitrogen(TN) effluent by water quality management(WQM) model and the results were compared data from these wastewater treatment plants. No bugs and logic error were occurred during simulation work. All of the simulation results tried to two times were obtained and both results were almost same as this model has become good reappearance. It was concluded that most of nitrogen removal occurred in the first oxic tank. Thus the controlling of the first anoxic tank may be more important in term of nitrogen removal. Also each unit of simulation result was kept good relationship with that of measured data. Accordingly this WQM model has good reliance. Finally, WQM model can predict final TN effluent within ${\pm}6.0mg/{\ell}$.

키워드

참고문헌

  1. J. G. Huub, The Nitrogen Cycle out of Balance, Water21, August, 65 (2001)
  2. 환경부, 총인.총질소의 방류수수질기준 및 배출허용기준 적용지역 (1995)
  3. 배장순, 박찬교, 성기천, 이석우, 황용현, '점토를 이용한 폐수 중 중금속 흡착에 관한 연구', 한국유화학회지, 21(2), 124 (2004)
  4. Y. Sakai, H. Hikami, and Y. Kawata, Step-feed and Anoxic-oxic Activated Sludge Process, 27th Annual Conference of Japan Sewage Work Association, 381 (1990)
  5. 村田恒雄, '下水の高度處理技術,' pp. 201-203, 理工図書, 東京 (1992)
  6. M. Henze, C. P. L. Grady, W. Gujer, GvR. Marais, and T. Matsuo, 'Activated Sludge Model No. 1. IAWQ Scientific and Technical Report No.1,' P. 33, IAWQ, London (1987)
  7. M. C. Wentzel, G. A. Ekama, and GvR. Marais, Process and Modelling of Nitrification Denitrification Biological Excess Phosphorus Removal Systems. A Review, Water Sci. Tech., 25(6), 59 (1992)
  8. M. Henze, W. Gujer, T. Mino, T. Matsuo, M. Wentze, GvR. Marais, and MeM. Loosdrecht, Activated Sludge Model No. 2d., Water Sci. Tech., 39(1), 165 (1999)
  9. P. S. Barker and P. L. Dold, General Model for Biological Nutrient Removal Activated Sludge Systems: Model Presentation, Water Environ Res., 69(5), 969 (1997)
  10. S. Fujii and I. Somiya, Simulation of Nitrogen Balance in Large-scale Domestic Sewage Treatment Plant Including the Sludge Treatment Process, Proceedings of the Third KYOTO-KAIST Joint Seminar/Workshop on Civil Engineering, 803 (1990)
  11. S. G. Puvinayagam, 'Development of Water Quality Management System in Sewage treatment Plant,' AIT Master Thesis (1992)
  12. B. D. Lee, 'A Study of the Optimal Conditions for Biological Nitrogen Removal in Activated Sludge Process by Theoretical Analysis and Numerical Calculation,' AlT Master Thesis (1994)
  13. T. R. Bridle, D. C. Climenhage, and A. Stelzing, Operation of Full-scale Nitrification - Denitrification Industrial Waste Treatment plant, Wat. Poll. Cant. Fed., 51, 47 (1979)
  14. T. Murase, T. Takahash, and T. Mori, Nitrification-Denitrification Operation in a Full-scale Plant utilization of Step-feed and Return Sludge Storage Tank, 28th Annual Conference of Japan Sewage Work Association, 505 (1991)
  15. T. Hattori, S. Nakayama, and H. Watazu, Promotion of Nitrogen Removal by Change of Operational Conditions in the Dual Recycling Method, 28th Annual Conference of Japan Sewage Work Association, 499 (1991)