초록
The purpose of this study is to analyze the economic feasibility of the construction of a new ecological park, based on the case of a plan in Yeongcheon City. For fulfilling the purpose of this study, questionnaire survey was conducted in Yeongcheon City. Based on the survey data, cost-benefit analysis is conducted. For this study, costs and benefits of the project are estimated. Then, using NPV, IRR, and B/C ratio criteria, cost-benefit analysis for this study is conducted. from the empirical cost-benefit analysis, NPV of the proposed project is estimated at 5,420 million Won, IRR is estimated at 12.16%, and B/C ratio is estimated at 1.44. Thus, it is found that the construction of a new ecological park in this area would be feasible from the economic point of view.