DOI QR코드

DOI QR Code

Verification of biological nitrogen removal model in anoxic-oxic process

무산소-산소 공정에서 생물학적 질소 제거 모델의 검증

  • Published : 2005.12.01

Abstract

Anoxic-oxic process were analyzed numerically for the each unit and final TN effluent by Water Quality Management(WQM) model and the results were compared data from these sewage or wastewater treatment plants. No bugs and logic error were occurred during simulation work. All of the simulation results tried to two times were obtained and both results were almost same thus this model has good reappearance. A few of simulation results were deviated with measured data because lack of influent water qualities are reported however simulation results have wholly good relationship with measured data. Also each unit of simulation result was kept good relationship with that of measured data therefore this WQM model has good reliance. Finally, WQM model predicts final TN effluent within ${\pm}4.1\;mg/{\ell}$

Keywords

References

  1. Henze, M., CPL. Jr. Grady, W. Gujer, GvR. Marais and T. Matsuo, 1987, Activated sludge model No. 1. IAWQ Scientific and Technical Report No.1, IAWQ, London, 33pp
  2. Wentzel, M. C., G. A. Ekama and GvR. Marais, 1992, Process and modelling of nitrification denitrification biological excess phosphorus removal systems, a review, Water Sci. Tech., 25(6), 59-82
  3. Henze, M., W. Gujer, T. Mino, T. Matsuo, M. Wentzel, GvR. Marais and M. C. M. Loosdrecht, 1999, Activated sludge model No. 2d., Water Sci. Tech., 39(1), 165-182
  4. Barker, P. S. and P. L. Dold, 1997, General model for biological nutrient removal activated sludge systems: model presentation, Water Environ. Res., 69(5), 969-984 https://doi.org/10.2175/106143097X125669
  5. Fujii, S. and I. Somiya, 1990, Simulation of nitrogen balance in large-scale domestic sewage treatment piant including the sludge treatment process, Proceedings of the third KYOTO-KAIST joint seminar/workshop on civil engineering, 803-806
  6. Puvinayagam, S. G., 1992, Development of water Quality management system in sewage treat-ment plant, AIT master thesis
  7. Lee, B. D., 1994, A study of the optimal conditions for biological nitrogen removal in activated sludge process by theoretical analysis and numerical calculation, AIT master thesis
  8. Murase, T., T. Takahash and T. Mori, 1991, Nitrification-denitrification operation in a fullscale plant-utilization of step-feed and return sludge storage tank, 28th Annual Conference of Japan Sewage Work Association, 505-507