Abstract
The conventional activated sludge processes were operated as a combined organic substrate removal and nitrification. So, it was necessary to provide with oxygen for both carbon and ammonia removal. But, in the BNR processes, nitrification is separated from carbon removal that causes fast ammonia oxidation and reduced oxygen demands. And most of the substrate is utilized by denitrification organisms and phosphorus accumulating organisms. with these appearances, mathematical model for BNR processes different from IWA ASM can be simplified and applied. In this study, it was performed that the existing equations as McKinney model, nitrification model published by U.S. EPA and oxygen demands from stoichiometry and the relationship between NUR and OUR were applied to full-scale BNR processes and the results were compared with the measured. and it is possible to make out the optimum design parameter from those equations.