Abstract
Instrumentation and Control (I&C) of the Neutral Beam Test Stand (NB- TS) Facility at the Korea Atomic Energy Research Institute (KAERI) for the Korea Superconducting Tokamak Advanced Research (KSTAR) project has been underway since the start of the project to answer the diverse requests arising from the various facets of the development and construction phases of the project. Optical signal transmission constitutes a significant portion of I&C works and has been performed for the entirety of the project. During the NB- TS construction and related experiments, significant achievements to a more accurate as well as more refined optical signal transmissions have been made. Examples of those I&C works that utilized the optical signal transmission are the Langmuir probe signal transmission, gradient grid current signal transmission, gas flow control and signal transmission, ion source temperature measurement, beam line component temperature monitoring, and coolant flow signal transmission, etc. These optical signal transition provisions are now performing part of the indispensable functions for the proper operation of the NB- TS facility. Attained experience and expertise are expected to be well applied to the upcoming main neutral beam injection (NBI) system construction for the KSTAR project.