Abstract
Transmission networks play an important role which transfer generated electric power to a consumer in power system operation. In a competitive environment of electric power industry, developing the technological criterions and methodologies on transmission planning is becoming new challenge to transmission system planner. The use of a locational signal and the provision of a indicative plan to control the transmission investment reasonably is very important in the viewpoint of a regulator. The main target of this study is to develop a systematic criterion of transmission expansion planning. And system congestion cost is considered. The proposed methodology was demonstrated with several case studies.