Abstract
Roadbed failure due to the natural disaster may bring out social and economic damage such as the loss of life and property, the consumption of time and cost for recovery, and the delay of logistics in railway In this study, the method using geosynthetic soilbag was applied to rehabilitation of the railway roadbed which was failed by disaster. The full scale tests with the simulated train loading were performed in order to evaluate the static and dynamic performance at the railway roadbed using geosynthetic soilbag. The results of these tests were compared with unreinforced and reinforced cases with geosynthetic soilbag, respectively The data gathered by various measurement devices from these full scale tests would be useful to evaluate and understand the roadbed with geosynthetic soilbag. In conclusion, geosynthetic soilbag was evaluated as a permanent restoration method to reinforce the roadbed of railway.
자연재해에 기인한 철도노반의 유실 및 파괴는 유실된 선로복구를 위한 공사가 장기간 소요됨으로써 정상적인 철도운행에 지장을 초래하여 사회적, 경제적으로 많은 비용 및 시간의 손실을 유발시키고 있다. 본 연구에서는 자연재해로 인해 유실된 철도노반에 대한 신속하고 안전한 복구대책으로서 토목섬유로 제조된 Soilbag의 적용성을 평가하고자 정적하중 및 모사반복 열차하중 재하 실대형시험을 수행하였다. 실대형시험을 통해 심도별 연직토압과 침하량을 계측한 결과, 하중분산효과에 기인한 토압 및 침하 저감 효과를 확인할 수 있었으며 시공성과 장기적 안정성을 고려할 때 Soilbag 공법의 현장적용성은 가능할 것으로 판단된다.