Abstract
It is muck important to determine the intercepting capacities as measures for reducing the load of contamination influenced by CSOs during wet weather period. Intercepting and treating the whole rainfalls can be best measured for reducing the contamination load, but it is not desirable in view of scale and preservation of the wastewater treatment facilities. This study analyzed the quantity and quality of the water in the combined sewer by method of changing the type and size of drainage basin and intercepting capacities in rainfalls, estimate the influence the other CSOs at the change of planned intercepted quantity, and compared the degree of contamination load between the combined system and separate system by examining the influence of the other CSOs at the change of planned intercepted quantity.
우천시 합류식 하수도의 월류수(CSOs)에 의한 오염부하량을 감소하기 위한 대책으로 차집량의 결정은 매우 중요하다. 오염부하량 감소를 위한 대책으로 우수를 전량 차집하여 처리하는 것이 가장 바람직하겠으나, 시설의 규모와 기타 유지 관리면에서 합리적이지 않다. 본 연구에서는 배수구역의 유역형상, 면적, 강우시 차집량 등을 변화시키면서 이로 인해 변화하는 합류식 하수관거의 유랑과 수질 등을 분석하였으며, 계획차집량의 변동에 다른 CSOs의 영향을 파악함과 동시에 합류식과 분류식을 각각 비교해 봄으로서 하천에 방류되는 오염부하량의 정도를 비교해 보았다.