References
- 장시영, 신동익, ‘정보시스댐 성과평가 방법론 연구-개발프로젝트를 중심으로’, 한국경영학회 경영저널, 제1권, 제1호, 2000, pp.189-207
- ANSI(American National Standards Institute), ‘ANSI-748: Earned Value Management Systems’, 1998
- Basili, V. R., F. E. McGarry, R. Pajerski and M. V. Zelkowitz, ‘Lessons learned from 25 years of process improvement: the rise and fall of the NASA software engineering laboratory’, 24th International Conference on Software Engineering, May 2002, pp.69-79
- Chrissis, M. B., M. Konrad and S. Shrum, CMMI: Guidelines for Process Integration and Product Improvement, Addison Wesley, 2003
- Conn, R., ‘A Reusable, Academic-Strength, Metrics-Based Software Engineering Process for Capstone Courses and Projects’, Proceedings of the 35th SIGCSE technical symposium on Computer science education, March 2004, pp.492-946
- Curtis, B., W. E. Hefley and S. A. Miller, ‘People Capability Maturity Model (P-CMM)’, SEI Report, CMU/SEI-2001- MM-01, July 2001
- Davis, N. and J. Mullaney, ‘The Team Software Process (TSP) in Practice: A Summary of Recent Results’, SEI Technical Report, CMU/SEI-2003-TR-014, 2003
- Goldenson, D. R. and D. L. Gibson, ‘Demonstrating the Impact and Benefits of CMMI: An Update and Preliminary Results’, SEI Technical Report, CMU/SEI- 2003-SR-009, 2003
- Humphrey, W. S., A Discipline for Software Engineering, Reading MA: Addison-Wesley, 1995
- Humphrey, W. S., Introduction to the Personal Software Process, Reading MA: AddisonWesley, 1997
- Humphrey, W. S., Introduction to the Team Software Process, Reading MA: AddisonWesley, 2000
- Humphrey, W. S., Winning with Software: An Executive Strategy, Reading MA: AddisonWesley, 2002
- IFPUG(Intemational Function Point Users Group), Function Point Counting Practices Manual, Version 4.1, 2003
- Jalote, P., CMM in Practice: Processes for Executing Software Project at Infosys, Reading MA: Addison-Wesley, 2000
- Jones, C., Software Assessments, Benchmarks and Best Practices, Reading MA: AddisonWesley, 2000
- Krishnan, M. S., C. H. Kriebel, S. Kekre and T. Mukhopadhyay, ‘An empirical analysis of cost and conformance quality in software products’, Management Science, Vol. 46, No. 6, June 2000, pp.745-759
- Liblit, B., A. Aiken, A. X. Zheng and M. I. Jordan, ‘Bug Isolation via Remote Program Sampling’, ACM SIGPLAN 2003 Conference on Programming Language Design and Implementation, June 2003, pp.141-154
- Liu, X. E, G. Kane and M. Bambroo, ‘An Intelligent Early Warning System for Software Quality Improvement and Project Management’, 15th IEEE International Conference on Tools with Artificial Intelligence (ICTAl' 03), 2003
- Parsons, H. M., ‘What Happened at Hawthorne?’, Science, Vol. 183, No.8, Mar. 1974, pp. 922-932
- SEI(Software Engineering Institute), ‘Process Maturity Profile: CMMI v1.1 SCAMPI v1.l Appraisal Results 2003 Year End Update’, 2004, http://www.seLcmu.edu./sema/pdf/CMMI/2oo4marCMMI.pdf.
- Solomon, P., ‘From Performance-Based Earned Value (PBEV) to the Capability Maturity Model-Integrated (CMMI)’, DoD Software Technology Conference(STC), April 2002
- Zage, D. and W. Zage, ‘An Analysis of the Fault Correction Process in a Large- Scale SDL Production Model’, Proceedings of the 25th International Conference on Software Engineering, May 2003, pp. 570-577
- SGI (Standish Group International Inc.), ‘Extreme chaos’, 2001, http://standishgroup.comfsample_researchjPDFpagesjextreme_chaos