참고문헌
- Askin, R. G and Huang, R. Y., 2001, Forming effective work teams for cellular manufacturing. International Journal of Production Research, 39(11), 2431-2451
- Baker, K. R., 'Workforce allocation in cyclical scheduling problems: A survey', Operational Research Quarterly, Vol. 27, No. 1, 1976, pp.155-167
- Bartholdi, J. J. and Platzman, L. K., 'An O(n logn) planar traveling salesman heuristic based on spacefilling curves', Operations Research Letters, Vol.1, No. 4, 1982, pp.121-125
- Bartholdi, J. J. and Platzman, L. K., 'Design of efficient bin-numbering schemes for warehouses', Material Flow, Vol. 4, 1988, pp.247-254
- Billionnet, A., 1999, 'Integer programming to schedule a hierarchical workforce with variable demands'. European Journal of Operations Research, 114, 105-114
- Bozer, Yavuz A., Meller, Russell D. and Erlebacher, Steven J., 'An improvement type layout algorithm for single and multiple-floor facilities', Management Science, Vol. 40, No. 7, 1994, pp.918-932
- Browne, Jimmie, Harhen, John and Shivnan, James, 'Production Management Systems', Addison-Wesley Publishing Company, 1988
- Brusco, M. J., John, T. R. and Reed, J. H. (1998), 'Cross utilization of a two skilled workforce', International Journal of Operations & Production Management, Vol. 18 No.6, pp.555-64 https://doi.org/10.1108/01443579810370116
- Burns, R. N. and Koop, G. J., 'A modular approach to optimal multiple-shift manpower scheduling', Operations Research, Vol. 35, No. 1, 1987, pp.100-110
- Cho, S. A., Kim, Chae-Bogk and Lee, D. H., 'Single machine MAD/Tmax problem with a common due date', Computers & Operations Research, Vol. 18, No. 3, 1991, pp.255-262
- Cochran, J. K. and Horng, H. -C. (1999), 'Dynamic dispatching rule-pairs for multitasking workers in JIT production systems', International Journal of Production Research. Vol. 37 NO. 10, 2175-2190
- Connolly, D. T., 'An improved annealing scheme for the QAP', European Journal of Operational Research, Vol. 46, 1990, pp.93-100
- Dal-El, E. M. and Cother, R. F., 'Assembly line sequencing for model mixing', International Journal of Production Research, Vol. 13, 1975, pp.463
- Dahlen, P., Ericsson, J. and Fujji, H. (1995), 'Labour stability and flexibility-conditions to reach just in time', International Journal of Operations & Production Management, Vol. 15 No.9, pp.26-43 https://doi.org/10.1108/01443579510099634
- Downey, B. S. and Leonard, M. S. (1992), 'Assembly line with flexible work force', International Journal of Production Research, Vol. 30 No. 3, pp.469-83 https://doi.org/10.1080/00207549208942906
- Dowsland, Kathryn N., 'An exact algorithm for the pallet loading problem', European Journal of Operational Research, Vol. 31, 1987, pp.78-84
- Dowsland, Kathryn N., 'Efficient automated pallet loading', European Journal of Operational Research, Vol. 44, 1990, pp.232-238
- Ebeling, A. C. and Lee, C. Y. (1994), 'Cross training effectiveness and profitability', International Journal of Production Research, Vol. 32 No. 12, pp.2843-59 https://doi.org/10.1080/00207549408957104
- Grag, S., Vart, P. and Kanda, A. (2002), 'Trade-offs between multiskilling and inventory in assembly lime operations under demand variability', International Journal of Operations & Production Management, Vol. 22 No.5, pp.565-83 https://doi.org/10.1108/01443570210425183
- Harary, Frank, 'Graph Theory', Addison-Wesley Publishing Company, 1972
- Heragu, S. S. and Kusiak, Andrew, 'Efficient models for the facility layout problem', European Journal of Operational Research, Vol. 53, 1991, pp.1-13
- Kim, C. and Foote, B. L., 'Minimizing the mean squared deviation from a commom due date : Unconstrained and constrained cases', Production Planning & Control, Vol. 7, 1996, pp.492-502
- Kim, C., Kim, S., and Foote, B. L., 'Assignment problems in single-row and double-row machine layouts during slow and peak periods', Computers & Industrial Engineering. Vol. 30, No. 3, 1996, pp.411-422
- Kouvelis, Panagiotis and Chiang, Wen-Chyuan, 'A simulated annealing procedure for single row layout problems in flexible manufacturing systems', International Journal of Production Research, Vol. 30, No. 4, 1992, pp.717-732
- Laarhoven, P. J. M., Aarts, E. H. L. and Lenstra, J. K., 'Job shop scheduling by simulated annealing', Operations Research, Vol. 40, No. 1, 1992, pp.113-125
- Levitin, G. and Rubincvitz, J., 'Genetic algorithm for linear and cyclic assignment problem', Computers & Operations Research, Vol. 20, No. 6, 1993, pp.575-586
- Liang, T. T. and Buclatin, B. B., 'Improving the utilization of training resources through optimal personnel assignmnet in the U.S. navy', European Journal of Operational Research", Vol. 33, 1988, pp.183-190
- Miltenburg, John, 'Level schedules for mixed-model assembly lines in just in time production systems', Management Science, Vol. 35, No. 2, 1989, pp.192-207
- Miltenburg, John and Goldstein, T., 'Developing production schedules which balance part usage and smooth production loads for just-in-time production systems', Naval Research Logistics, Vol. 38, 1991, pp.893-910
- Norman, B. A., Tharmmaphornphilas, W., Needy, K. L., Bidanda, B. and Warner, R. C. (2002), 'Worker assignment in cellular manufacturing considering technical and human skills', International Journal of Production Research. Vol. 40 NO. 6, 1479-1492
- Plenert, G. (1997), 'Line balancing techniques as used for just-in-time (JIT) product lime optimization', Production Planning and Control, Vol. 8 NO. 7, pp.686-93
- Radhakrishnan, Sanjay and Ventura, J. A., 'Simulated annealing for parallel machine scheduling with earliness-tardiness penalties and sequence-dependent set-up times, International Journal of Production Research, Vol. 38, No. 10, 2000, pp.2233-2252
- Sarker, Bhaba R., 'Optimum manpower models for a production system with varying production rates', European Journal of Operational Research, Vol. 24, 1986, pp.447-454
- Seo, J. H., Kim, Chae-Bogk and Lee, D. H., 'Minimizing mean squared deviation of completion times with maximum tardiness constraint', European Journal of Operational Research', Vol. 33, 1988, pp.183-190
- Suryanarayanan, J. K., Golden, B. L. and Wang, Q., 'A new heuristic for the linear placement problem', Computers & Operations Research, Vol. 18, No. 3, 1991, pp.255-262
- Shin, D. and Min, H., 1991, Uniform assembly line balancing with stochastic task times in just-in-time manufacturing. International Journal of Operations and Production Management, 11, 23-34
- Sule, D. R. and Norris, W. J., 1992, Manpower assignment strategies in serial production limes with limited personnel: evaluation of pull-push rules. Computer and Industrial Engineering, 22, 231-243
- Van Oyen, M. P., Gel, E. S. and Hopp. W. J., 2001, Performance opportunity for workforce agility in collaborative and non-collaborative work system. IIE Transactions, 33, 807-818
- Vohra, R. V., 'The cost of Consecutivity in the (5,7) cyclic staffing problem', IIE Transactions, Vol. 19, No. 3, 1987, pp.296-299
- Wilhelm, M. R. and Ward, T. L. 'Solving quadratic assignment problems by simulated annealing problem', IIE Transactions, March, 1987, pp.107-119