국제항공화물의 운송 지연에 대한 항공운송인의 책임

The Air Carrier연s Liability for Damage Caused by Delay in the Transport of International Air Cargo

  • 발행 : 2004.02.01

초록

Delay in the air transport occurs when passengers, baggage or cargo do not arrive at their destination at the time indicated in the contract of carriage. The causes of delay in the carriage of cargo are no reservation, lack of space, failure to load the cargo on board, loading the cargo on the wrong plane, failure to off-load the cargo at the right place, or to deliver the covering documents at the right place. The Montreal Convention of 1999 Article 19 provides that "The carrier is liable for damage occasioned by delay in the carriage by air of cargo. Nevertheless, the carrier shall not be liable for damage occasioned by delay if it proves that it and its servants and agents took all measures that could reasonably be required to avoid the damage or that it was impossible for it or them to take such measures." The Montreal Convention Article 22 provides liability limits of the carrier in case of delay for cargo. In the carriage of cargo, the liability of the carrier is limited to 17 SDR per kilogram unless a special declaration as to the value of the cargo has been made. The Montreal Convention Article 19 has shortcomings: it is silent on the duration of the liability for carriage. It does not give any indication concerning the circumstances to be taken into account in cases of delay, and about the length of delay. In conclusion, it is desirable to define the period of carriage with accuracy, and to insert the word 'unreasonable' in Article 19.

키워드