Abstract
The present study was designed to evaluate primary production organic matter in basin of lake around by execution of total maximum daily loading. BOD influent loading of Uiam lake was 2,819 kg/day, which was less then 28.3 percent, total effuluent loading as 3,619 kg/day, in comparision with BOD, total nitrogen influent loading was 4,681 kg/day, which was less then 10.0 percent, total effuluent loading as 5,150 kg/day. But in case of total phosphors influent loading was 73.3 kg/day, which was more then 34.2 percent, total run off loading as 48.3 kg/day. The result of survey reduction plan of primary production organic matter in basin of lake around which objectives of abstract is as follows. First plan was reduction of primary production organic matter by moving the outlet of municipal wastewater treatment center from present place to lake downstream. Secondary plan was improvement by diffusion type of outlet municipal wastewater treatment center. The third plan was reduction of environmental impact by passing and storing of municipal wastewater. Finally plan was decline water surface level which was present hydrouric retention time was reduction from 7.6 day to 6.0 day per meter.