Abstract
In this paper, the analysis result of the switching surge in substation including GIS(Gas Insulated Switchgear) has been described using the EMTP(Electro Magnetic Transient Program) program. After performing the modeling of the input data, we have reviewed the energization overvoltages of GCB(Gas Circuit Breaker) without closing resistor in 345kV network, according to the conditions of simultaneously operating switch and statistically operating switch. Firstly, it can be known that the energization overvoltage of single line is higher than that of parallel energized line. Secondly, the maximum energization overvoltage obtained in statistics switch is higher than one in simultaneous switch. From these results, it can be known that the phase-to-earth energization overvoltages of $\alpha$-$\beta$ section are less than 2.2 p.u when closing resistor is eliminated. Therefore, it is possible to consider the circuit breaker eliminated the closing resistor in $\alpha$-$\beta$ section.