지방자치단체 환경영향평가 조례 비교 연구

A Comparative Study on the Local Governments' Environmental Impact Assessment Regulations in Korea

  • 성현찬 (경기개발연구원) ;
  • 민수현 (대통령자문 지속가능발전위원회 기획조정실 정책연구팀)
  • Sung, Hyun-Chan (Kyonggi Research Institute) ;
  • Min, Soo-Hyun (Policy Research Team, Presidential Commission on Sustainable Development of Korea)
  • 투고 : 2003.05.08
  • 심사 : 2003.06.13
  • 발행 : 2003.07.31

초록

This study aims to survey whether local governments have legislated laws and regulations on environment impact assessment system, to compare and analyze specific projects and their scale, assessment items, and procedures & discussion process, to identify issues and generate improvement plans, and to suggest a direction for future legislation to local governments that plan to legislate laws and regulations in the future. Major outcome of the study are as follows. First, terminologies used for environment impact assessment by local governments need to be unified. Also, laws and regulations need to be legislated soon. Second, in "urban development project" areas, a total of nine project areas including "quarrying of soil and stone, sand, gravel, and minerals" was essential common projects. A total of six project types were added or newly established compared to national systems. Among them, four project types were added within national-level project areas and two project types were not available under the national-level project areas and newly added due to the nature of local governments. Third, in terms of project scale, scale enhancement of "urban development project" was most common. Analysis showed that in case of clean natural environment such as Cheju Island, it is necessary to consider reinforcing project areas where development activities take place directly in forests or rivers such as "industrial base and complex development", "water resource development", and "development of tourism complex." Fourth, the discussion and review procedures of assessment reports were similar to those at government level. However, in case of Seoul city, it is required to write a "preparation plan" before drafting an assessment report. The city features partial introduction of scoping and screening, which allows to exempt discussion procedures if impact on environment is found to be minimal after drafting the assessment report. In case of national-level, it has a dual system that is split between Ministry of Construction and Transportation and Ministry of Environment. However, in case of environment impact assessment of local governments, it is a single system where city mayors and provincial governors are in charge of both project execution and environmental assessment. Therefore, the most important task is how to satisfy objectiveness and accountability.

키워드

참고문헌

  1. 김귀곤. 1993. 우리나라 환경영향평가제도 및 기법의 발전방향, 환경영향평가학회지, 2(1), 19
  2. 김선희. 2000. 환경영형평가의 역할 및 범위 재정립 방안연구. 환경영향평가학회지. 9(4)
  3. 남영숙. 1995. 지속가능한 지역사회 건설을 위한 지방자치단체 환경성 평가에 관한 연구. 환경리포트. 14
  4. 남영숙. 1996. 자자제 실시에 따른 환경영향평가제도의 내실화를 위한 연구. 한국환경기술개발원. p12
  5. 성현찬. 1995. 외국의 전략환경평가 제도에 관한 연구, 경기개발연구원 보고서
  6. 성현찬. 1996. 환경영향평가제도의 개선방안에 관한 연구. 경기개발연구원 경기연구. 1
  7. 성현찬. 2000. 경기도의 지방자치단체 환경영향평가제도 도입방안 연구. 경기개발연구원 보고서
  8. 성현찬 등. 1993. 환경영향평가서의 내실화를 위한 연구. 환경처
  9. 성현찬 등. 2000. 신제 환경영향평가론. 향문사
  10. 성현찬, 한상욱. 1995. 미국의 환경영향평가. 동화기술
  11. 이무춘. 2000. 우리나라 환경영향평가제도의 발전 과정과 개선방안에 관한 연구. 환경영향평가학회지. 9(1)
  12. 조진상. 1995. 독일지방자치단체의 환경영향평가경험
  13. 한상욱. 2001. 지역환경보전계획과 환경영향평가의 연계. 첨단환경기술 10월호
  14. 환경부. 1999. 각종 영향평가제도의 통합방안에 관한 연구
  15. 환경부. 2000. 4. 환경영향평가 제도 개선을 위한 세미나 자료집