프로세스 재정립을 통한 레미콘 운송 효율화에 대한 사례연구

A Study on Process Improvement of the Ready-Mixed Concrete Truck's Transportation Using GPS

  • 이원동 (한국사이버물류(주)) ;
  • 이영훈 (연세대학교 컴퓨터산업공학부)
  • 투고 : 20021100
  • 심사 : 20030100
  • 발행 : 2003.03.31

초록

Ready-Mixed Concrete transportation business has been managed by the manual operation and intuitive decision making. This study is on the process improvement on ordering process, and allocation/transportation of trucks commuting between the batching plant and construction sites. Processes of order collection, job dispatch and allocation, and on-time-delivery are analysed and improved. The logistics control system, with GPS system, was developed and implemented based on the reconstructed processes. Performances are evaluated after improved business process and logistics system was applied, and it is shown that waiting time loss is decreased by 55%, and that efficiency is increased by 15%.

키워드

참고문헌

  1. An, S.B., and Byun, Y.S. (1998), Structures and Information Technologies in CVO, Karean lnstitute of lndustrial Engineers, 11(1), 41-54
  2. Drucker, P.(1962), The Economy's Dark Continent, Fortune, April, 103
  3. Ham,S.H., and Lee, M.K.(1999), A Pickup/Delivery Management System using Geographic Information System and Global Positioning System, IE Interfaces, 12(4), 557-566
  4. Ko,C.S., Chung,K.H. and Shin.J.Y. (2000), Determination of Vehicle Fleet Size for Container Shuttle Service, Korean Management Science Review, 17(2), 87-95
  5. Kotler, P.(1980), Marketing management : analysis, planning, and control, Prentice-Hall, 449
  6. Lee,J.Y., and Park,Y.B.,(2001), A Decision Support System for Delivery policies at an internet Shopping Mall, Korean Management Science Review, 18(2),61-72
  7. Lee, S.R., Sun. J.U. and Lee, K.S. (2002), A Study on a To-Be System Design for the Operational Information System of Postal Service, Journal of the Korean Institute of Industrial Engineers, 28(3) 302-318
  8. Logistics Magazine, (2001), Allocation of cars Using I-mode Cellular Phone,126
  9. Myung, K.S., Park,S.K. and Kang,D.W. (2000), A Supply Chain Management Process Modeling for an Agriculture Marketing Information System, IE Interfaces, 13(3), 358-377
  10. No, I.G., and Yea,S.Y. (1996), A Heuristic for the Vehicle Routing Problem, Journal of Korean lnstitute of lndustrial Engineers, 22(1), 28-40
  11. Park, C.G., Lee, S.U., Park, S.D., Sung, K.S., and Jin, H.C.(2000), An implementation of network optimization system using GIS, Korean Management Science Review, 17(1), 55-64
  12. Park, Y.B., and Hong, S.C. (1998), An Interactive Decision Support System for Truck Dispatching, Korean Management Science Review, 15(2) 201-210
  13. Seo, H.J. and No,J.P. (1999), Physical Distribution, Ul-Gok Chulpansa, 25
  14. Seo, S.K. and Kwak, J.H. (2001), Redistribution and Replenishment policy of Empty Containers on Ocean Transportation Network, IE Interfaces, 140(3), 255-262
  15. Seo, Y.W., Hahm, J.H, Kim, M.S., and Ryu, K.T. (1999a), Process Improvement of Harbor Import-Expert Logistics Process, The Conference Proceedings of Korean Institute of Industrial Engineers, 436-437
  16. Seo, Y.W., Sung,C.H., and Hahm,J.H. (1999b), A Workflow Framework for the Integrated Logistics Systems, IE Interfaces, 12(1), 143-149
  17. Whistler, D. (1997), 18 Wheels and a Satrllite Dish, Sales and Field Field Force Management, March 1997, 67-70
  18. Youn, Y.H., Cheon, H,J., and Lee H.C. (2002), The Development of Delivery Sequence planning System for Express Mail Service, Journal of the Korean Society of Supply Chain Management, 1(2),69-76