Abstract
Fire hazard and risk analysis at Nuclear Power Plants is implemented on the basis of the normal operational configuration. This steady configuration, however, can be changed due to the temporary displacement of equipment, electric cable and irregular movement of workers through the fire compartments when the on-line maintenance is processed during the power operation mode or the scheduled outage mode for the refueling. With the consequence of this configuration change, the fire analysis condition and the evaluation result will be different from those that were analyzed based on the steady configuration. In this context, at this paper, the general items for the reassessment are categorized when the configuration has changed. The contemporary zone models for the detail fire analysis are also illustrated for their application for each classified condition.