도로 공사중의 교통영향권역 설정 및 적용성에 관한 연구

A Study on the Traffic Effect Zone and Application of Road Occupying Construction

  • 이주호 (대구대학교 산업기술연구소) ;
  • 이영우 (대구대학교 건설환경공학부) ;
  • 임채문 (대구대학교 건설환경공학부)
  • Lee, Ju-Ho (Institute of Industrial & Technology, Daegu University) ;
  • Lee, Young-Woo (Dept. of Construction & Environmental Eng, Daegu University) ;
  • Lim, Chae-Moon (Dept. of Construction & Environmental Eng, Daegu University)
  • 투고 : 2003.02.20
  • 심사 : 2003.05.25
  • 발행 : 2003.05.31

초록

The links operating interrupted flow are intend to yield the traffic between the out flow and inflow part effect zone of street section, we build the delay model using the time gap between under construction and not. We review the applicability of interrupted flow, and thus we can put this data to practical use as the basis data to compute the inducement charge for traffic delay. Also building about traffic effect zone of interrupted flow wouldn't produce at the section beside occupying roads and construction cross section, thus we must review the plan to minimize traffic delay by the construction occupying road. In future there must be advanced the incomplete in this study, and groping for the various alternatives to minimize the traffic delay by the road occupying construction, with developing the various sets of detailed analyzing models, that is analysis on the street strength, crossroads geometrical forms of crossroads, public traffics, pedestrians, occupying types.

키워드