Abstract
Generally, cable-stayed bridges are both statically indeterminate structure with a high degree of redundancy and flexible structure. So it is very important to ensure precision control during both fabrication and construction. In precision control of cable-stayed bridges, precision control under multi-objective programming method is needed, because precision control problem of cable-stayed bridges is a multi-objective programming problem in which many objective functions are regard as variables. In previous studies, it was regarded as a single-objective problem, so it had many problems in respect of usefulness and rationalness. In this study, precision control under multi-objective programming method is proposed considering economy, efficiency, and safety at best in precision control of cable-stayed bridges. Precision control problem of cable-stayed bridges is formulated with satisfying trade-off method which is a kind of multi-objective programming method, then it is optimized with min-max method. A computer program is presented including above process.