A Study on the Cable Length Adjustment of Cable-Stayed Bridges

사장교의 케이블 길이조정에 관한 연구

  • Published : 2003.03.01

Abstract

Generally, cable-stayed bridges are both statically indeterminate structure with a high degree of redundancy and flexible structure. So it is very important to ensure precision control during both fabrication and construction. In precision control of cable-stayed bridges, precision control under multi-objective programming method is needed, because precision control problem of cable-stayed bridges is a multi-objective programming problem in which many objective functions are regard as variables. In previous studies, it was regarded as a single-objective problem, so it had many problems in respect of usefulness and rationalness. In this study, precision control under multi-objective programming method is proposed considering economy, efficiency, and safety at best in precision control of cable-stayed bridges. Precision control problem of cable-stayed bridges is formulated with satisfying trade-off method which is a kind of multi-objective programming method, then it is optimized with min-max method. A computer program is presented including above process.

Keywords

References

  1. 澤仲光, "斜張橋架設時のシム豈決定方法(上)," 橋 と基 Vol. 18, No. 9, 1984, pp. 17-22
  2. 澤伸光, "斜張橋架設時のシム 決定方裝(下)," 橋 と基 Vol. 18, No. 10, 1984, pp. 41-45
  3. Beckmann, M. and Kunzi, H.P., 'Multi-Objective Programming and Goal Programming,' Springer, 1996
  4. 中山弘降, '多目的計劃法に對する滿足化トレ一ドオフ法の提案,' 計測自動制御學會, 第 20 卷, 第 1 号 , 1984, pp. 29-35
  5. Vanderplaats, G.N., 'Numerical Optimization Techniques for Engineering Design,' McGraw-Hili Book Company, 1984, pp. 140-150
  6. 이정로, '다중 목적함수 소프트웨어의 개발,' 한양대학교 대학원 석사학위논문, 1995
  7. 대림산업(주), '합성형 사장교의 시공단계해석 프로그램(DICCO) 개발,' 1995