Because of the difficulty of acquiring new generation sites and right-of-way, additional units have been added to the existing generation sites and the transmission system has been developed into highly meshed configuration. This structural characteristics may cause restriction on the reliable operation of power systems. In other to meet with this problem, the enhancement of system analysis techniques and establishment of appropriate measures have been required in this situation. In addition the deregulation of electric power industry in Korea would require better tools for power system analysis and control. In this paper, exciter system models, speed governor system models and PSS models of EUROSTAG for stability study are developed. Comparison with simulation results of PSS/E is performed for verification of EUROSTAG models.
신규 발전소 부지 및 송전선 경과지 확보의 어려움 때문에 신규 발전기들은 기존의 발전단지에 건설되고 송전망은 더 복잡한 망의 형태로 구성되고 있다. 이러한 구조적인 특징은 전력계통의 운용의 신뢰성에 제약을 발생시킨다. 이러한 문제를 해결하기 위해서 전력계통의 해석의 고도화와 적절한 대책이 요구된다. 또한 현재 진행중인 전력산업의 구조 개편 이후, 신뢰성과 경제성을 동시에 추구하여야하는 경쟁적 전력시장에서의 계통해석 결과에 따른 비용 발생시에 책임소재의 투명성과 해석결과에 대한 검증이 필요하게 되어 계통해석 기술의 고도_화와 이를 구현하기 위한 해석 프로그램의 다변화가 절실하게 요구된다. 본 논문에서는 대규모 전력계통 해석 프로그램인 EUROSTAG의 발전기 제어계 계통 의 모델을 개발하였고, 성능을 입증하기 위해서 현재 전력회사에서 사용되는 PSS/E와 시뮬레이션 결과를 비교하였다.