A Critique of Designing Resource Adequacy Markets to Meet Loss of Load Probability Criterion

  • Yoon, Yong T. (School of Electrical and Computer Engineering, University) ;
  • Felder, Frank A. (School of Business, Manhattan College)
  • Published : 2003.01.01

Abstract

To ensure resource adequacy in restructured electricity markets, policymakers have adopted installed capacity (ICAP) markets in some regions of the United States. These markets ensure that adequate generation exists to satisfy regional Loss of Load Probability(LOLP) criterion. Since the incentives created through ICAP mechanisms directly impact new generation and transmission investment decisions we examine one important factor that links ICAP markets with LOLP calculations;, determining the amount of ICAP credit assigned to particular generation units. First, we review and critique the literature on electric power systems' market failure resulting from demand exceeding supply. We then summarize the method of computing (the LOLP) as a means of assessing reliability and relate this method to ICAP markets. We find that only the expected value of available generation is used In current ICAP markets while ignoring the second and higher order moments, which tends to mis-state the ICAP value of a specific resource. We then consider a proposal whose purpose is to avoid this ICAP assignment issue by switching from ICAP obligations to options. We find that such a proposal may fail to not provide the benefits claimed and suffers from several practical difficulties. Finally, we conclude with some policy recommendations and areas for future research.

Keywords

References

  1. A. Jaffe and F. A. Felder, 'Should Electricity Markets Have A Capacity Requirement: If So, How Should It Be Priced?' The Electricity Journal, Dec. 1996, pp. 52-60
  2. P. Joskow, 'Electricity Sectors in Transition,' The En-ergyJournal, Vol. 19, No.2, 1988, pp. 25-55
  3. S. Stoft, Power System Economics: Designing Markets for Electricity, New Jersey: IEEE Press, 2002, p. 15
  4. R. L. Borlick, 'Competitive Electricity Markets Can Provide Optimum Power Supply Reliability,' IBC Conference on Reliability for Competitive Power, Sep-tember 29, 1997
  5. U.S. Federal Energy Regulatory Commission, Stan-dard Market Design Notice of Proposed Rulemaking, Docket No. RM01-12-000, July 31, 2002, pp. 259-290
  6. C. Vazquez, M. Rivier, and I. J. Perez-Arriaga, IEEE Trans. Power Syst., vol. 17, May 2002, pp. 349-357
  7. H. Varian, Microeconomic Analysis, 2nd ed., New York: Norton & Company, Inc., 1984
  8. F. C. Schweppe, M. C. Caramanis, R. D. Tabors, and R. E. Bohn, Spot Pricing of Electricity, Massachusetts: Kluwer Academic Publishers, 1987
  9. Y. T. Yoon, 'A Possible Notion of Short -term Value-based Reliability,' Proc. 2002 IEEE Power Engineer-ing Society Winter Meeting, pp. 315-320
  10. D. W. Carlton, 'Equilibrium Fluctuations When Price and Delivery Lag Clear the Market,' Bell Journal of Economics, Vol. 14, No.2, 1983, pp. 562-572 https://doi.org/10.2307/3003657
  11. New York Independent System Operator, 'NYISO Installed Capacity Manual', Schenectady, NY, De-cember 2002. http://www.nyiso.com/services/documents/ manuals/pdf/planning_manuals/icap_manua1_1 2_30_02.pd
  12. F. A. Felder, 'An Island of Technicality in a Sea of Discretion': A Critique of Existing Electric Power Systems Reliability Analysis and Policy,' The Elec-tricity Journal, April 2001, pp. 21-31
  13. F. A. Felder, 'Probabilistic Risk Analysis of Restruc-tured Electric Power Systems: Implications for Reli-ability Analysis and Policies' PhD. Dissertation, De-partment of Technology, Management and Policy, M.I.T., Cambridge, MA, 2001
  14. R. Billinton, Reliability, Assessment of Electric Power Systems Using Monte Carlo Methods, NewYork: Plenum Press, 1994
  15. North American Electric Reliability Council, 'Gener-ating Availability Trends Summary Report: Studies 1 to 5,' May 5,1989
  16. H. M. Merrill, G. Lawrence, and S. Lawrence, 'Un-derstanding New England Generating Unit Availabil-ity,' prepared by Merrill Energy LLC, Diamond Ridge, Inc., and Babcock & Wilcox, Inc. for the ISO New England Inc., Holyoke, MA, USA, June 14, 2001
  17. A. W. Drake, Fundamentals of Applied Probability Theory, New York: McGraw-Hill, 1967
  18. ISO-NE, 'Report on Studies Evaluating Reliability Impacts of Deactivation of Devon Units 7, 8, and 10,' July 9, 2002
  19. Y. T. Yoon and F. A. Felder, 'Study of Loss of Load Probability in Designing Installed Capacity Market,' Proc. 2002 IEEE Power Engineering Society Summer Meeting, Chicago, IL., July 21-25,2002