참고문헌
- 박진영, '서비스기업의 성과측정도구로서식스시그마', 인하대학교 경영연구소,[경영논집] , 제8편 제2호
This paper considers a six sigma project for reducing the defects rate of the welding process in manufacturing firms. The project follows a disciplined process of five macro phases. define, measure, analyze, improve and control(DMAIC). The need of customers is used to identify critical to quality(CTQ) of project. And a process map is used to identify process input factors of CTQ. Four key process input factors are selected by using an input factor evaluation of teams; an interval of welding, an abrasion, an electric current and a moving freely. DOE is utilized for finding the optimal process conditions of the three key process input factors. Another one key input factor improved to welding machine. The six sigma level of defects rate becomes a 2.01 from a 1.61 at the beginning of the project.