Abstract
Since Korean government imposed a stricter regulation on effluent T-N and T-P concentrations from wastewater treatment plant, a new process has to be developed to meet these rules and this process should remove T-N and T-P, economically, from weak wastewater that is typical for Korea's combined sewer system sewage. In this study, a computer simulator, BioWin from EnviroSim, Inc. was used. Three processes - A2/O, Modified Johannesburg, UCT- had been simulated under same operational conditions and a new process - Parallel BNR Process - had been developed based on these simulation results. The Parallel BNR process consists of two rows of reactors: One row has anaerobic and aerobic reactors in series, and the other row has RAS anoxic1 and RAS anoxic2 reactors in series. In order to ensure anaerobic state in anaerobic tank, a part of influent is fed to RAS anoxic1 tank in second row. This process had been simulated under same conditions of other three processes and the simulation results were compared. The results showed that three existing processes could not perform biological phosphorus removal when the average influent was fed at any operation temperatures. However, the Parallel BNR process was found that biological phosphorus removal could be performed when both design and average influent were fed at any operation temperatures. This process showed the T-N concentration in effluent had a maximum value of 15mg/L when design influent was fed at $13^{\circ}C$ and a minimum value of 14mg/L when average influent was fed at $20^{\circ}C$. Also, T-P concentrations had a maximum value of 1.3mg/L when average influent was fed at $20^{\circ}C$ and a minimum value of 1.1mg/L when design influent was fed at $13^{\circ}C$. Based on these results, we found that this process can remove nitrogen and phosphorus biologically under any operational conditions.