Convergence change in a tunnel face approaching fault zones

파쇄대에 접근하는 터널의 내공변위 변화 해석

  • 이인모 (고려대학교 토목환경공학과) ;
  • 이승주 (고려대학교 토목환경공학과) ;
  • 이주공 (고려대학교 토목환경공학과) ;
  • 이대혁 (SK건설(주) 연구소)
  • Published : 2002.09.01

Abstract

The purpose of this study is to figure out the tendency of tunnel convergence during excavation and to present a methodology for the prediction of a fault zone ahead of a tunnel face by analyzing three dimensional displacements in various ways. 3-D numerical analysis was performed to investigate changes of tunnel convergence vectors near a fault zone and to propose a flow chart for predicting fault zones. Results of the site investigation and results of trend line analysis of in-situ data were compared to verify the usefulness of a trend line analysis. It is concluded that the orientation of faults can be predicted by using stereonets and the direction of initial stresses can be predicted from the arm length of a displacement vector as a tunnel approaches fault zones. The results of the trend line analysis coincided with those of the site investigation, and a methodology for the prediction of a fault zone was proposed.

본 연구는 터널 굴착시 막장 전방의 지반변화를 사전에 예측할 수 있는 방법을 제시하고자 하였다. 이를 위하여 막장 전방에 파쇄대가 방향성을 가지고 존재 할 때 터널의 3차원 해석을 통하여 터널의 내공변위의 변화 경향을 살펴보았으며, 이를 통하여 막장전방의 지반 변화를 파악하고자 하였다. 이러한 터널의 내공변위의 변화는 경향선과 영향선을 이용하여 표현할 수 있으며 이를 이용하여 막장 전방에 존재하는 파쇄대를 예측하고자 하였다. 수치해석 결과에 의하면 막장전방에 파쇄대가 존재 할 경우 막장이 파쇄대에 접근할 수록 급격한 경향선의 변화가 나타난다. 또한 파쇄대가 방향성을 가지고 있는 경우에는 경향선의 급격한 변화 외에 측벽부의 변위 경향이 비대칭을 이루므로 인하여 평사투영도 상에 나타난 변위가 비대칭을 형성하는 것으로 파악되었다. 이러한 수치해석결과에 의한 내공변위 해석결과를 현장 계측 자료와 비교하였으며, 현장에서 계측한 오차를 줄일 수 있도록 계측데이터가 정규분포 한다고 가정하여 현장데이터를 분석한 결과 막장전방의 파쇄대의 존재 유무를 파악할 수 있는 것으로 나타났다.

Keywords