References
- Baynat, B. and Dallery, Y. (1993), a Unified View of Product-Form Approximation Techniques for General Closed Queueing Networks, Performance Evaluation, 18, 205-224
- Cheung, K. L. and Hausman, W.H. (1995), Multiple Failures in a Multi-Item Spares Inventory Model, lIE Transactions, 27, 171-180
- Duenyas, I. and Hopp, W. J. (1992), CONWIP Assembly System with Deterministic Processing and Random Outages, lIE Transactions, 24(4),97-111
- Duenyas. I. and Hopp, W. J. (1993), Estimating the Throughput of an Exponential CONWIP Assembly System, Queueing System, 14,135-157
- Duenyas, I., Hopp, W.J. and Spearman, M. L. (1993), Characterizing the Output Process of a CONWIP Line With Deterministic Processing and Random Outages, Management Science, 39(8), 975-988 https://doi.org/10.1287/mnsc.39.8.975
- Gattorna, J. (1998), Strategic Supply Chain Alignment, Gower, Hampshire, England
- Glasserman, P. and Wang, Y.(1998), Leadtime-Inventory Trade-Offs in Assemble to Order Systems, Operations Research, 46(6), 858-871 https://doi.org/10.1287/opre.46.6.858
- Harrison, P. G. and Patel, N. M. (1992), Performance Modeling of Communication Networks and Computer Architectures, Addison-Wesley, Seoul, Korea
- Hausman, W. H.(1982), On Optimal Repair Kits under a Job Completion Criterion, Management Science, 28(11), 1350-1351 https://doi.org/10.1287/mnsc.28.11.1350
- Lee, H. L. and Billington, C. (1993), Material Management in Decentralized Supply Chains, Operations Research, 41(5), 835-847 https://doi.org/10.1287/opre.41.5.835
- Lee, H. S. and Lee, J. E. (1998), Approximate Analysis of a CONWIP system with a Lot Production, Journal of the Korean Institute of industrial Engineers, 11(3), 53-64
- Lee, J. E. and Lee, H. S. (1998), Approximate Analysis of a CONWIP system with Compound Poisson Demands, Journal of the Korean Operations Research and Management Science, 23(3), 153-168
- Mamer, J.W. and Smith, S.A. (1982), Optimizing Field Repair Kits Based on Job Completion Rate, Management Science, 28(11), 1328-1333 https://doi.org/10.1287/mnsc.28.11.1328
- Mascolo, M. D., Frein, Y. and Dallery, Y. (1996), an Analytical Method for Performance Evaluation of Kanban
- Controlled Production Systems, Operations Research, 44(1),50-64
- Marie, R A (1979), an Approximate Analytical Method for General Queueing Networks, IEEE Trans. Soft, Eng., SE-5(5), 530-538
- Neuts, M. F. (1981), Matrix Geometric Solutions in Stochastic Models-an Algorithmic Approach, John Hopkins University Process, Baltimore
- Smith, S.A, Chambers, J.C. and Shlifer, E. (1980), Optimal Inventories Based on Job Completion Rate for Repairs Requiring Multiple Items, Management Science, 26(8), 849-852 https://doi.org/10.1287/mnsc.26.8.849
- Song, J. S. (1998), On the Order Fill Rate in a Multi-item, Base Stock Inventory System, Operations Research, 46(6),831-845 https://doi.org/10.1287/opre.46.6.831
- Song, J. S., Xu, S. H. and Lin, B. (1999), Order-Fulfillment Performance Measures in an Assemble-to-Order System with Stochastic Leadtimes, Operations Research, 47(1),131-149 https://doi.org/10.1287/opre.47.1.131
- Spearman, M. L., Woodruff, D. L. and Hopp, W. J. (1990), CONWIP: a Pull Alternative to Kanban, Int. J. Prod. Res., 28(5), 879-894 https://doi.org/10.1080/00207549008942761