Determination of Flow Rate for Operation of the Borland Fishlock

볼랜드식 어도 운영을 위한 유지수량 결정

  • Published : 2001.06.30

Abstract

The purpose of this study is to determine flow rate for operation system of the Borland fishlock. The fish ladder is usually constructed at the diversion weir crossing the river. But, at the place of the high dam, the fish ladder is very difficult to keep

Keywords