Rough-cut simulation algorithm for the decision of operations policy at the block paint shop in shipbuilding

조선 도장공정 운영전략 수립을 위한 사전모의실험기법

  • 정귀훈 (현대중공업 산업기술연구소) ;
  • 박창규 (울산대학교 경영대학 경영학부) ;
  • 민상규 (현대중공업 산업기술연구소) ;
  • 박주철 (울산대학교 공과대학 산업공학부) ;
  • 조규갑 (부산대학교 공과대학 산업공학)
  • Published : 2001.03.31

Abstract

This paper introduces the case study that has been performed at the block paint shop, Hyundai Heavy Industries. First of all, the overall production processes of shipbuilding and research activities conducted by Korean are reviewed with a view-point of production planning. Then HYPOS(Hyundai heavy industries Painting shop Operation System) project is briefly described, which has several modules such as planning module, scheduling module, work order module, and DB(database) management module. Although the HYPOS system has several modules, this paper mainly focuses on the planning module that utilizes the rough-cut simulation algorithm to make a decision about the policy for production schedule. The HYPOS has been operated since June, 2000 and the operation data has been collected for the purpose of future evaluation about the performance of HYPOS system. The evaluation of HYPOS will be shown in a public domain as soon as the enough operation data is available.

Keywords