Abstract
The present time this country is faced with general hospital building remodeling time from the constructing age. In architecture, one of the reconstruction of consciousness, remodeling significance Is restoration of capacity a generally structure. Through this research we acquire concluding remarks. 1) In hospital extension and reconstruction works set a different counterplot proportionately with part that are the ward areas, the outpatient areas, the diagnosis/treatment areas, the supply areas, the administration areas, the education/research areas, the miscellaneous areas etc. According to department's character and use various purposes take proper measures. Then it estimation that remodeling study shall be need. 2) It is advisable the way of connection the existing facilities if it extended case. The case of K hospital has been extended outskirts the main building. As this an enlargement of a outhouse has an advantage that secure construction area at a stretch and no exert Influence on both nature lighting and construction matter. On the contrary caused [defect that is repeatedly occur a faculty relocation and the inner part alteration because of it\`s post transfer.