References
- W.S. Read, W.K. Newman, I.J. Perez-Arriaga, H.Rudnick, M.R. Gent & A.J. Roman, 'Reliability in the New Market Structure (Part 1)' IEEE Power Engineering Review, December, 1999, p.4-14 https://doi.org/10.1109/MPER.1999.808165
- W.S. Read, W.K. Newman, I.J. Perez-Arriaga, H.Rudnick, M.R. Gent & A.J. Roman, 'Reliability in the New Market Structure (Part 2)' IEEE Power Engineering Review, January, 1999, p.10-16 https://doi.org/10.1109/MPER.2000.814650
- CEA, Industry Restructuring - New & Info: CEA connections online news, March 2000
- IMO, 'Participating in Ontario's New Competitive Electricity Market' Overview Report by IMO, November 1999
- Joseph Vardi and Benjamin Avi-Itzhak, Electric Energy Generation; Economics, Reliability and Rates: MIT, 1981
- X. Wang and J.R. McDonald, Modern Power System Planning: McGraw-Hill, 1994
- A.J. Wood and B.F. Wollenberg, Power Generation Operation and Control: John Wiley & Sons, 1984
- J.P. Stremel, R.T. Jenkins, R.A. Babb, and W.D. Bayless, 'Production Costing Using the Cumulant Method of Representing the Equivalent Load Curve,' IEEE Trans. on Power Apparatus and Systems, vol.PAS-99, no.5, pp.1947-1956, Sep./Oct. 1980 https://doi.org/10.1109/TPAS.1980.319819
- D.J. Levy and E.P. Kahn, 'Accuracy of the Edgeworth Expansion of LOLP Calculations in Small Power Systems,' IEEE Trans. on Power Apparatus and Systems , vol.PAS-101, no.4, pp.986-996, April 1982 https://doi.org/10.1109/TPAS.1982.317165
- G. Gross, N.V. Garapic and B. McNutt, 'The Mixture of Normals Approximation Technique for Equivalent Load Duration Curves' IEEE Trans. on Power Systems, vol.3, no.2, pp.368-374, May 1988 https://doi.org/10.1109/59.192886
- R.L. Sullivan, Power System Planning, McGraw-Hill, 1977
- Roy Billinton and Wenyuan Li, Reliability Assessment of Electric Power Systems Using Monte Carlo Methods : Plenum Press, 1994
- Roy Billinton and Ronald N. Allan, Reliability Evaluation of Power Systems, Plenum Press, 1984
- Roy Billinton and Easin Khan, 'A Security Based Approach to Composite Power System Reliability Evaluation', IEEE Trans. on Power Systems, vol.PS-7, no.1, pp.65-72, February 1992
- Roy Billinton and W. Zhang, 'Enhanced Adequacy Equivalent for Composite Power System Reliability Evaluation', IEE Proc. GTD, vol.143, no.5, pp.420-426, September 1996 https://doi.org/10.1049/ip-gtd:19960460
- Jaeseok Choi, Daeho Do, Seungpil Moon and Roy Billinton, 'Development of a Method of ELDC Conctruction in a Composite Power System', Proceedings of Large Engineering Systems Conference on Power System 99(LESCOPE99), pp. 189-194, Halifax, NS, Canada, June 20-22, 1999
- Jaeseok Choi, Seungpil Moon, Hongsik Kim, Byongjun Lee and Roy Billinton, 'Development of ELDC and Reliability Evaluation of Composite Power System Using Monte Carlo Method', Proceedings of IEEE PES SM2000 Conference, Seattle, WA, USA, July 16-20 2000
- 김 홍식, 임 채현, 최 재석, 이 순영, 차 준민, '규제완화된 전력시장 하에서의 전력계통 신뢰도 할당 방법에 관한 연구' 2000년 대한전기학회 하계학술대회 논문집, pp.394-396
- 차 준민, 김 홍식, 최 재석, 오 광해, '규제완화된 전력시장 하에서의 송전계통 신뢰도 평가방법의 개발' 2000년 대한전기학회 하계학술대회 논문집, pp.397-399
- 김 홍식, 문 승필, 최 재석, 노 대석, ' 각 부하지점별 확률론적 발전비용 산정을 위한 수치해석적 방법' 2001년 대한전기학회 전력기술부문회 춘계학술대회 논문집, pp.112-115