초록
The purpose of this research is to develop interior construction cost-estimating system at the early stage of the project. Though general construction estimates are typically in quantitative, interior construction should be in rather qualitative. Therefore, design-concerned cost-estimating methods should be developed to manage interior projects from the early statge. 30 estimates of VIP-Zone interior projects, were examined to develop the general type of composition and material classification. The cost has been classified by construction parts such as wall, ceiling, floor, and doors & windows and their treatments. The composition and material related estimating system (CMRES) was consisted of the unit average costs of classification and the variation coefficients. The CMRESS was verified by the case study, and the results sowed that the difference between the actual estimate and the CMRES was competitively confident.