Abstract
Since the reliability of results by the existing analyzing method is low, in the case of for excavation performed in urban area whose stability is of great importance, construction control based on field monitoring is always necessary. But the field monitoring reflects only the behavior of construction process that has already been carried out, and it has limitations in predicting the behavior of the expected construction process, which is practically more important for construction control. In this study, construction control system for excavation which can predict the behavior of the expected processes during construction with high degree of accuracy, is developed by adopting inverse analysis. The inverse analied applied field monitoring results to excavation analysis can improve the reliability of predicted results. The developed system uses an elasto-plastic soil spring model for the excavation analysis and the minimization of least squared errors between measured displacements and calculated displacements for the inverse analysis. All the required processes for construction control can be performed as an integrated work within the system reflecting real time application and user's convenience. Their applicabilitis are confirmed by two case studies.
일반적으로 도심지에서 이루어지는 굴착은 안정성의 중요도에 비하여 해석의 정확도가 떨어지기 때문에 시공 중 현장계측관리가 필수적으로 수반된다. 그러나 계측은 이미 진행된 공정의 거동을 나타내는 것이고, 실제로 시공관리에 도움이 되는 향후 예정된 공정에 대한 예측에는 한계가 있다. 본 연구에서는 계측결과를 해석에 반영하여 예측 결과의 신뢰성을 제고하는 역해석기법을 이용하여 굴착 시공 중 차후 공정의 거동예측을 정확하게 예측할 수 있는 굴착 관리 정보화 시스템을 개발하였다. 개발시스템은 탄소성 지반스프링 모델을 이용한 탄소성 기법을 토대로 측정변위와 모델에 의하여 계산된 변위간의 최소자승 오차를 최소화하는 역해석 기법을 사용하였으며, 정해석, 계측관리, 역해석을 시스템 내에서 일관되게 수행할 수 있고, 실시간 적용과 사용자의 편의를 감안하였다. 개발된 시스템을 두 가지 사례에 적용한 결과 굴착 지반의 거동을 정확하게 예측할 수 있음을 확인하였다.