Estimation Methods of Groundwater Recharge Rate in Small Basin

소유역의 지하수함양율 추정기법

  • Published : 1999.06.01

Abstract

It is necessary to estimate the groundwater recharge rate properly to predict the demand of groundwater and to establish the plan for the development of groundwater in the future. In this paper, A small basin in Chojung area is selected to calculate the groundwater recharge rate. In the calculation, water balance analysis, SCS-CN (Soil Conservation Service-Curve Number) method. groundwater-level analysis and hydrograph of outflow analysis are applied to this area. Data of precipitation measured by Chungju climatological station for about 10 years are used for water balance analysis and SCS-CN method. For the groundwater-level analysis. variations of groundwater-level measured from the 3 test wells in 1997's are used and stage-discharge rating curves in this area for 3 years are used for the hydrograph of outflow. The recharge rate calculated by water balance is 19%, 12.95% by SCS-CN method. 16.51% by groundwater-level analysis and 10.9% by hydrograph of outflow analysis and the overall average recharge rate is about 14.84%.

지하수 수요예측과 개발계획을 수립하기 위해서 지하수 함양율을 적절히 산정할 필요가 있다. 본 연구에서는 초정리 일원의 소유역을 선정하고 이 유역에 대해서 지하수 함양량 추정기법중 물수지분석법. SCS-CN 방법. 지하수위 강하곡선법 및 유출수문곡선법으로 함양율을 추정하였다. 물수지분석법과 SCS-CN 방법에서는 청주기상대의 10년 강우자료가 이용되었다. 지하수강하곡선법을 위해서는 1997년 한해 동안 3개의 관측정으로부터 얻은 지하수위자료를 이용하였고, 유출수문곡선법 적용시에는 3개년도의 수위.유량곡선자료가 이용되었다. 각 방법에 의한 함양율은 물수지분석법이 19%. SCS-CN 방법이 12.95%, 지하수강하곡선법이 16.5%. 그리고 유출수문곡선법이 10.9% 정도의 결과값을 보였다. 상기 방법들에 의해 계산된 이 유역의 지하수 평균함양율은 14.84%이었다.

Keywords