This paper presents the evaluaton procedures and the estimation model for DSM potential on commercial sector in Korea. In general, the evaluation process of the potential savings for DSM measures or programs consists of baseline electricity consumption forecast and potential evaluation such as technical potential(TP), economic potnetial(EP), and achievable potential(AP). A library of energy conservation measures applicable to each end-use or apparatus is developed, and energy savings and other factors are applied to the baseline demand estimates of consumption to produce potential savings estimates. The purpose of this paper is to establish the evaluation process of those DSM potential for commercial sector. In case study, we applied it to commercial sector for horizon years by end-use.

Keywords

References

  1. 신조명기기 시범보급 및 효과측정 한국전력공사
  2. 전동기보급 실태조사 한국전력공사
  3. Technical Potential for Electricity Savings and Peak Demand Reduction Planergy
  4. Assessment of Demand-side Alternatives XENERGY
  5. Demand Forecasting for Electric Utilities C.W.Gellings;W.L.Barron;J.H.Chamberlin;A.Faruqui
  6. Principles and Practice of Demand-Side Management EPRI
  7. Data Analysis in DSM Planning Process Barakat & Chamberlin
  8. 장기전력수요예측 한국전력공사
  9. DSM 잠재량평가의 모니터링을 위한 기법개발 및 활용방안 연구 한국전기연구소
  10. DSM 성과계량 및 비용효과분석모델 개발 한국전기연구소
  11. Avoided Cost for Utilites: A theotical and Practical Handbook MSB Energy Associate
  12. 발전시장의 장기전망과 민자발전의 효율적 추진방안 한국전기연구소;한국전력공사
  13. IRP자원유형별 평가기법과 DB에 관한 연구 한국전기연구소;한국전력공사