Design of Complete Inspection Procedures Using the Performance and Screening Variables

주품질특성 및 대용특성을 활용한 전수검사의 설계

  • 홍성훈 (전북대학교 산업공학과)
  • Received : 19980300
  • Published : 1998.06.30

Abstract

A quality inspection procedure interchangeably using the performance and screening variables is proposed. At the start of the inspection, the performance variable is measured for all items. As soon as i consecutive items are found to be free of defects, the screening variable is measured instead of the performance variable. If an item is rejected, the inspection based on the performance variable is resumed. All nonconforming items found in the inspection are either reworked or replaced with conforming items. It is assumed that the performance variable is dichotomous, and the screening variable given the performance variable is normally distributed with known mean and variance. The average outgoing quality (AOQ) expression is derived, and the methods of finding the inspection procedure with a specified average outgoing quality limit (AOQL) are presented.

Keywords

Acknowledgement

Supported by : 한국학술진흥재단