농지이용증진사업의 경제효과분석

Analysis of Economic Effects of the Land Utilization and Promotion Projects(In the Case of Sinseok Area, Dangjin Districts in Chungnam Province)

  • 박재근 (충남대학교 대학원) ;
  • 임재환 (충남대학교 농과대학 농업경제학과)
  • Park, Jae-Keun (Graduate School, Chungnam National University) ;
  • Lim, Jae-Hwan (Dept. of Agricultural Economics, College of Agriculture, Chungnam National University)
  • 발행 : 1998.12.30

초록

This study is aimed at identifying the decision making criteria as B/C ratio, IRR and NPV based on the expected benefits and costs of the land utilization and promotion projects which have implemented to improve agricultural structure under WTO system. To carry out the objectives of the study, Sinseok project area located at Dangjin district, Chungnam province was selected. Sinseok project area has 306.2 ha of paddy area with 172 farm households. The project area will be operated by the 33 specialized farm households after completion of the project which will have 20 years of economic life. After completion of the project, farm size will be increased from 1.8ha to 9.3ha. Land intensity of the project area will be increased by 10%. Increase of land productivity and cost saving due to the labor saving technology as farm mechanization will be expected. According to the survey results, the annual amount of production cost savings per farm was estimated 3.884million won and increased total farm income was expected about 43.8million won per year. The total expexted project benefits was expected 174million won per year. The project costs to promote land utilization and structural change consisted of handling charges, and direct payment for land movility. The decision making criteria representing economic feasibility of the project such as B/C ratio, NPV and IRR were estimated 2.49, 483million won and 30% respectively when the cut-off rate was taken into account 10%. In conclusion, the land utilization and promotion project proppeled by the Korean Government under the agricultural land law is considered economically feasible from the view points of expected project benefits and costs. Accordingly the project have to be implemented more strongly under the G't financial support considering WTO and UR negociation which were aimed at achieving the free trade and improvement of international competitiveness of farm products.

키워드