The Fusion Characteristic Varying with Butt Fusion Times for Polyethylene Pipe

PE배관 버트 융착 시간에 따른 융착 특성 변화

  • 이영순 (서울산업대학교 안전공학과) ;
  • 장영오 (서울산업대학교 안전공학과)
  • Published : 1998.12.01

Abstract

Butt fusions were practiced with butt fusion in the various conditions of fusion temperatures, pressure and time, and the tests of tesile strength, breaking water pressure and fusion features were also practiced so that the reliability of the butt fusion and the fittets fusion condition may be closely examined. And the width, height and thickness of the beads were also closely measured. The fittest fusion result was achieved in the condition of the temperature of $210^{\circ}C$, heating time hight pressure of 14 seconds on the pressure of $1.5kg/cm^2$, heating time hight pressure of 100 seconds and pressure buid-up time of 11 seconds. And in case of the temperature of $250^{\circ}C$, the fittest fusion result was showed in the condition of the heating time hight pressure of 3 seconds on the pressure of 1.0$kg/cm^2$, the heating time low pressure variable of 100 seconds. heating time hight pressure of 14 seconds and the heating maintenance of around 60 seconds. The result of breaking water pressure test of a test piece fusion in the fittest fusion condition was that the fusion condition of the PE pipe showed a good stability and hight reliance. Through this test, it is proved that the temperature of fusion PE pipes can be increased to $250^{\circ}C$ from $210^{\circ}C$. And it can be expected that the above fusion method greatly helps to reduce the fusion time.

Keywords