The Application of Fuzzy DHP in MIS Project Selection

퍼지 DHP를 이용한 정보시스템 프로젝트의 선정

  • Published : 1998.06.01

Abstract

This study presents a FZOGP(fuzzified zero-one goal programming) model and a DHP (Delphic Hierarchy Process) that can be used to help information systems(IS) managers decides which IS projects should be selected. Delphic method is conducted prior to AHP so that not only can the objectives to be considered in analysis be determined, but the opinions of all decision makers can also be incorporated in problem formulation. While the DHP provides an ideal ranking process for the selection of IS Projects, it does not consider real constraints that exists in decision making process. Then this study intends to show how the DHP can be used to establish a priority structure for use within a FZOGP model. The advantages of FZOGP model are as follows: the imprecise aspiration level for each objective can be considered in FZOGP model. And, the common features between the new FZOGP and the GP models are that the objective functions in both models are minimized and the structure of their formulations are the same.

본 논문에서는 성공적인 기업활동에 많은 영향을 미치는 정보시스템 계획에 있어주요 관리활동중의 하나인 정보시스템 프로젝트의 선정과정에 대해 DHP(Delphic Hierarchy Process)기법과 FZOGP(Fuzzified Zero-One Goal Programming) 모형을 검토하였다. 정보시스템 선정과정에 적용되는 기존의 AHP에서는 우선순위 결정에 있어 객관적인 측면과 전문가들의 의견이 충분히 반영되지 못하기 때문에 Delphi법을 동시에 고려하는 DHP기법이 필요성이 제시되어지는 것이다. 그러나 이러한 우선순위결정기법은 의사결정과정에 있어서 기업의 자원의 제약과 같은 현실적인 면이 고려되었다고 할 수 없기 때문에 목표계획법의 적용이 검토된다. 또한 다기준 의사결정의 상황에서 목표기준의 모호함이 기존의 목표계획법에서는 반영되지 않기 때문에 이러한 점을 고려하여 퍼지집합을 적용한 모형을 구축하고자 하였다.

Keywords