Abstract
The author conducted new back analysis method using monitoring data to a landslide which occurred around portal. In this case, because the tunnel being located under the sliding plane of the landslide, calculated value from the ordinary back analysis in which considered only stress release by the tunnel excavation didn't fit the measured value. Then, in the new method, a body force as the movement of the landslide mass was added to the ordinary back analysis and good results were obtained. Furthermore, the author carried out stability analysis of the landslide with the data of the back analysis and examined the loosened area and decreasing og the sliding plane strength due to the tunnel excavation.