SMC Full PACS로의 전환 및 System 구축

  • Kim, Sam-Soo (Department of Radiology, Samsung Medical Center) ;
  • Ro, Duk-Woo (Department of Radiology, Samsung Medical Center) ;
  • Cheung, Hwan (Department of Radiology, Samsung Medical Center)
  • Published : 1997.05.13

Abstract

The purpose of this paper is to describe the transition of a 1,100 beds teritary hospital from 50% softcopy operation to full PACS operation. For the past 2 years, radiologists and clinicians have been using PACS to provide softcopy services to the outpatient clinics and inpatient wards of orthopedics surgery, neurosurgery and neurology as well as emergency room, surgical intensive care unit, medical intensive unit, pediatrics intensive care unit and neonatal intensive care unit. The examinations requested by these departments account for about 50% of hospital's radiological exams. In September 1996, we began the second phase of PACS implementation and installed additional workstations (102) in the remaining wards and clinics, interfaced to PACS additional imaging modalites, and increased the capacity of both the image server (256 Gbytes) and optical juke boxes (3 Tbytes). As of January 1997, we are in the final phase of moving away from conventional film system to full PACS operation.

Keywords