The Development of Full-Scope Replica Type Simulator for PWR Nuclear Power Plants

가압경수로 원자력 발전소의 전범위 복제형 시뮬레이터 개발

  • 이중근 (전력연구원 시스템통신연구소)
  • Published : 1997.06.01

Abstract

Designing and constructing a proper simulator for real power plants requires extensive research in human engineering and computer science and integration of different fields of technologies such as system analysis, operational knowledge for nuclear plant, etc. A full scope replica type simulator for nuclear power plant is developed. The simulator has the same feature and operational functions as one in the main control room (MCR) of a reference power plant. The simulator provides the necessary training to recover or reduce damages from accidents that usually are unpredictable. This paper describes the configurations and characteristics for the simulator that is developed for Younggwang Nuclear Power Plant #3,4 which is the basic model of the Korean Nuclear Power Plant. The paper also describes technical aspects of Auto Code Generator that is used for developing the simulator. The successful development of the simulator will contribute to improve safety in operation of nuclear power plants.

Keywords

References

  1. KRC-91I-J03 제 2차 중간 보고서 발전소 운전원 훈련용 모의제어반 국산화 개발 적용 이철언(외)
  2. Simulators International XII Proceeding KEPCO's 3 PACK Simulator Development Plan Lee, Yong-kwan(etc)
  3. ANSI/ANS-3.5 Nuclear Power Plant Simulators for Use in Operator Tranining and Examination ANS
  4. S3T Users Manual 「STK, PETACT, TOPMERET, FLOEnet, Generator, EDnet, Instructor Station, US3」
  5. 1994-X.08-7 공무 국외 여행 귀국 보고서 이중근(외)
  6. CE- NPSD -35 Functional Design Requironments For Core Protection Calculator Combustion Engineering, Inc.
  7. CE-NPSD-366 Functional Design Requironments For Control Element Assembly Calculator Combustion Engineering, Inc.
  8. CE-NPSD-423 Functional Design Requironments For Core Operating Limit Supervisory System for YGN #3,4 Combustion Engineering, Inc.
  9. YGN 3&4, 3S-I-000-18 CPC/COLSS Verification Test Procedure