Determination Scheme of Variable Restricted Water Level during Flood Period of Multipurpose Dam

다목적 댐의 홍수기중 가변제한수위 결정 방안

  • Published : 1997.12.01

Abstract

When flood control storage lacks for the reservoir operation of multipurpose dams during flood period, the additional flood control storage should be considered for the flexible use of limited storage capacity. Flood period is divided by meteorological characteristics in this study and the water levels for water demand and flood control are investigated for the divided flood period. Based on the investigations, we suggest the variable restricted water level(VRWL) from the considerations of water conservation and flood control which can determine dam operating water level during flood period. This paper presents an application of the methodology to determination of the VRWL during flood period at the Taechong Dam and the results are discussed.

다목적 댐의 홍수기 저수지 운영에 있어 댐 규정에 명시된 홍수조절용량이 부족하다고 판단되는 경우, 한정된 저수공간의 탄력적인 이용방안을 강구하여 추가적인 홍수조절용량을 확보하여야 한다. 본 연구에서는 홍수기의 기상특성을 반영하여 홍수기를 시기적으로 구분하고, 구분된 홍수기간별로 각각의 이수목적수위와 치수목적수위를 검토하였다. 검토된 결과를 바탕으로 서로 상반되는 이수와 치수를 함께 고려할 수 있는 방안을 강구하였으며, 이로부터 결정된 홍수기 댐 운영수위를 홍수기 가변제한수위라 정의하였다. 홍수기 가변제한수위를 결정하는 일련의 절차에 대해 대청 다목적 댐을 대상으로 적용하고 그 결과를 분석하였다.

Keywords

References

  1. 가변제한수위와 저수지 홍수변환법에 의한 홍수기중 저수지 운영 권오익
  2. 한국수자원학회논문집 v.30 no.3 예측홍수의 방류량 결정방안에 관한 연구 권오익;심명필
  3. '96년 하계 기상 전망 공군 제73기상전대 연구부
  4. 한국수문학회지 v.28 no.6 홍수기중 가변제한수위에 의한 저수지 운영 심명필;권오익;이환기
  5. 대한토목학회논문집 v.12 no.3 위험도제약 선형계획법에 의한 홍수기 저수기 운영 이길성;강부식
  6. 다목적댐 운영 실무편람 한국수자원공사
  7. 홍수기 대청댐 운영수위 검토 한국수자원공사
  8. Generic consideration in reallocation of water storage at Corps of Engineers reservoirs Comiskey, J. J.
  9. J. Water Resour. Plng. Mgmt. v.116 no.3 Reservoir storage reallocation analysis with PC David, T. F.
  10. J. Water Resour. Plng. Mamt. v.118 no.3 System analysis applications at the Hydrologic Engineering Center Feldman, A. D.
  11. J. of Water Resour. Plng. Mgmt. v.116 no.4 Opportunities for reservoir-storage reallocation Johnson, W. K.;Wurbs, R. A.;Beegle, J. E.
  12. Technical Paper No. 126, The Hydrologic Engrg. Ctr. The value and depreciation of existing facilities: The case of reservoirs Lund, J.R.
  13. Recomm. Rep. Waco lake storage reallocation study U.S. Army Corps of Engineers
  14. HEC-5 simulation of flood and conservation system, users manual U. S. Army Corps of Engineers
  15. Optimum reservoir for flood control and conservation purposes Wurbs, R. A.;Cabezas, L. M.;Tibbets, M. N.
  16. Evaluation of storage reallocation and related strategies for opimizing reservoir system operation Wurbs, R. A.;Carriere, P. E.