Abstract
Many reservoirs have been constructed and operated for utilizing and controlling water in main rivers of Korea since 1960's. New reservoirs are planned to satisfy increasing water demands according to the National Long-Term Water Resources Development Plan, that will make the entire water resources system more complex. That means reasonable approach is necessary to review many alternatives for future policy decision making of water resources management. As an attempting to simplify the water problem of the large-scale reservoirs system with more than 10 reservoirs, two stages approach such as simulation approach(HEC-5) is first applied to medium and small reservoirs and the results are used as inputs to final optimization approach (IDP) including large reservoirs is used in the water budget analysis of Han river water resources. In addition, existing multi-purpose reservoirs and planned reservoirs in Han river are formulated into one system and DPSA is applied to solve the basin-wide water resources assessment problem.
1960년대 이래로 우리나라 주요수계에는 이·치수를 목적으로 많은 댐들이 건설되어 운영되어 오고 있다. 계속 증가하는 용수수요를 충족시키기 위한 신규댐 개발이 국가 장기 수자원 개발계획에 포함되어 있어 수자원 시스템은 더욱 복잡해 질 것으로 예상된다. 이와 같은 특징은 장래 수자원 관리 정책 결정문제에서 보다 많은 대안 검토를 요구하게 되므로 이를 해결할 수 있는 합리적인 접근방법의 개발이 요구된다. 본 연구는 10여개 이상의 대구모 저수지 시스템 문제를 해결하기 위한 방법중 문제를 간략화하기 위한 시도로 중·소규모 댐에 대해서는 모의모형(HEC-5)을 적용하고 이의 결과를 대용량의 댐으로 구성된 최적화 모형(IDP)의 입력자료로 이용하여 최종적인 결과를 얻는 2단계 해석 방법을 한강유역 물수지 분석에 적용하였다. 아울러 한강수계의 기존 다목적댐과 장래 개발 계획댐을 하나의 시스템으로 구성하고 DPSA를 이용하여 유역 개념의 수자원 평가에 적용하였다.