As a part of comprehensive IGCC process simulation, the thermal performance analysis was performed for coal gas firing combined power plant. The combined cycle analyzed consisted of il Texaco gasifier and a low temperature gas cleanup system for the gasification block and a GE 7FA gas turbine, a HRSG and steam turbine for the power block. A steady state simulator called ASPEN(Advanced System for Process Engineering) code was used to simulate IGCC processes. Composed IGCC configuration included air integration between ASU and gas turbine and steam integration between gasifier, gas clean up and steam turbine. The results showed 20% increase in terms of gas turbine power output(MWe) comparing with natural gas case based on same heat input. The results were compared with other study results which Bechtel Canada Inc. performed for Nova Scotia power plant in 1991 and the consistency was identified within two studies. As a result, the analysing method used in this study is verified as a sound tool for commercial IGCC process evaluation.

석탄가스화 복합발전(IGCC) 시스템의 공정 시뮬레이션의 일환으로서 석탄가스용 복합발전 플랜트의 성능해석을 하였다. Texaco 가스화기와 저온가스 정제공정에서 생성된 가스를 연료로 하는 가스터빈/증기터빈/폐열회수보일러로 구성된 복합사이클발전시스템을 구성한 후, ASPEN(Advanced System for Process Engineering) Code를 이용하여 정상상태 성능해석을 수행하였다. 가스터빈 사이클(GE MS 7001FA)은 공기분리 공정과의 연계성(Integration)이 고려되었고, 증기사이클은 가스화공정과 가스정제 공정과의 연계성(Integration)을 고려하여 구성하였다. 공정해석결과 가스터빈출력(MWe)은 천연가스를 사용하는 경우에 비하여 동일 입열량(연소기 입구기준)기준으로 약 20%의 증가를 가져왔다. 본 연구의 결과를 Bechtel Canada Inc.에서 Nova Scotia 발전소를 대상으로 1991년에 수행한 연구결과와 비교하였을때 잘 일치하였으며, 이를 통하여 본 연구에서 사용된 해석방법이 상용화 공정의 시뮬레이션에 적정하게 이용될 수 있음을 확인하였다.

Keywords